BlueSafe

Deep Excavation (over 1.5m) and Ground Stability SWMS

This SWMS covers planning and carrying out deep excavation work over 1.5 metres, including ground stability controls.

Activities covered include

  • Plan the excavation work and coordinate site activities
  • Install and remove ground support
  • Backfill, remove support and demobilise

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Deep Excavation (over 1.5m) and Ground Stability SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers planning and carrying out deep excavation work over 1.5 metres, including ground stability controls. It supports work planning and risk management from ground assessment and service location through excavation, support, backfilling and close-out.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan the excavation work and coordinate site activities
  • Assess ground conditions and changing soil conditions
  • Locate and isolate underground services
  • Secure the site, excavation edges and access areas
  • Position plant away from excavation hazards
  • Excavate progressively and manage spoil
  • Install and remove ground support
  • Control groundwater and water inflow
  • Protect adjacent structures and buried assets
  • Manage work within the excavation
  • Inspect conditions as work and weather change
  • Backfill, remove support and demobilise

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out deep excavation and ground stability work.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan excavation work
  • Unplanned ground collapse
  • Incorrect excavation design
  • Inadequate emergency response
  • Conflicting site activities
Assess ground conditions
  • Unstable soil strata
  • Groundwater inflow
  • Frozen ground thaw
  • Contaminated soil
  • Undermined ground
Locate and isolate services
  • Underground services strike
  • Electric shock
  • Gas release
  • Water inundation
  • Communication outage
Secure site and edges
  • Fall into excavation
  • Unauthorised entry
  • Falling objects
  • Slip and trip hazards
  • Public exposure
Position plant safely
  • Plant roll-over
  • Excavation edge failure
  • Plant-person collision
  • Swinging counterweight
  • Hydraulic failure
Excavate progressively
  • Face collapse
  • Falling spoil
  • Plant strike
  • Over-excavation
  • Unstable foundation pit
Install ground support
  • Collapse during installation
  • Crush from support components
  • Failure of shoring
  • Suspended load strike
  • Pinch points
Control groundwater
  • Water inundation
  • Base heave
  • Face softening
  • Pump electrical shock
  • Contaminated water
Protect adjacent structures
  • Undermined footing
  • Building settlement
  • Wall collapse
  • Damage to buried assets
  • Falling masonry
Work within excavation
  • Entrapment by collapse
  • Fall from access ladder
  • Atmospheric contamination
  • Plant interaction
  • Manual handling injury
Inspect changing conditions
  • Rain-induced collapse
  • Thawing ground failure
  • Erosion and scour
  • Damaged edge protection
  • Unnoticed ground movement
Backfill and remove support
  • Collapse during support removal
  • Plant strike
  • Compaction vibration
  • Unstable backfill
  • Open excavation exposure
Demobilise and sign off
  • Residual open holes
  • Plant movement
  • Unstable reinstatement
  • Trips from debris
  • Incomplete records

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, provide safe systems of work, consult workers, manage construction work and control excavation hazards.
  • Model Code of Practice: Excavation Work (guidance only; confirm adoption and legal status in the relevant jurisdiction). It identifies support by shoring, shielding, benching or battering for trenches 1.5 m or deeper, and recognises competent geotechnical input for ground-support controls.
  • Model Code of Practice: How to Manage Work Health and Safety Risks (guidance only), including consultation, training, supervision, maintenance and review of controls.
  • Model Code of Practice: Managing the Risks of Plant in the Workplace; Model Code of Practice: Managing the Risk of Falls at Workplaces; Model Code of Practice: Confined Spaces; and Model Code of Practice: Hazardous Manual Tasks, as applicable guidance.
  • AS 4744.1 Trench shields; AS 5047 Hydraulic shoring and trench lining equipment; AS 3798 Guidelines on earthworks for commercial and residential developments; AS/NZS 3012 Electrical installations—Construction and demolition sites; AS/NZS 1337.1, AS/NZS 1715, AS/NZS 1716, AS/NZS 1270, AS/NZS 1801, AS/NZS 2210.3 and AS/NZS 4602.1, as applicable.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionCivil Construction and EarthworksMining and Resources

Related templates

$79.50

$96.80

Save $17.30

One-time payment