Deep Excavation (over 1.5m) and Ground Stability SWMS
This SWMS covers planning and carrying out deep excavation work over 1.5 metres, including ground stability controls.
Activities covered include
- Plan the excavation work and coordinate site activities
- Install and remove ground support
- Backfill, remove support and demobilise
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers planning and carrying out deep excavation work over 1.5 metres, including ground stability controls. It supports work planning and risk management from ground assessment and service location through excavation, support, backfilling and close-out.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the excavation work and coordinate site activities
- Assess ground conditions and changing soil conditions
- Locate and isolate underground services
- Secure the site, excavation edges and access areas
- Position plant away from excavation hazards
- Excavate progressively and manage spoil
- Install and remove ground support
- Control groundwater and water inflow
- Protect adjacent structures and buried assets
- Manage work within the excavation
- Inspect conditions as work and weather change
- Backfill, remove support and demobilise
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out deep excavation and ground stability work.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan excavation work |
|
| Assess ground conditions |
|
| Locate and isolate services |
|
| Secure site and edges |
|
| Position plant safely |
|
| Excavate progressively |
|
| Install ground support |
|
| Control groundwater |
|
| Protect adjacent structures |
|
| Work within excavation |
|
| Inspect changing conditions |
|
| Backfill and remove support |
|
| Demobilise and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, provide safe systems of work, consult workers, manage construction work and control excavation hazards.
- Model Code of Practice: Excavation Work (guidance only; confirm adoption and legal status in the relevant jurisdiction). It identifies support by shoring, shielding, benching or battering for trenches 1.5 m or deeper, and recognises competent geotechnical input for ground-support controls.
- Model Code of Practice: How to Manage Work Health and Safety Risks (guidance only), including consultation, training, supervision, maintenance and review of controls.
- Model Code of Practice: Managing the Risks of Plant in the Workplace; Model Code of Practice: Managing the Risk of Falls at Workplaces; Model Code of Practice: Confined Spaces; and Model Code of Practice: Hazardous Manual Tasks, as applicable guidance.
- AS 4744.1 Trench shields; AS 5047 Hydraulic shoring and trench lining equipment; AS 3798 Guidelines on earthworks for commercial and residential developments; AS/NZS 3012 Electrical installations—Construction and demolition sites; AS/NZS 1337.1, AS/NZS 1715, AS/NZS 1716, AS/NZS 1270, AS/NZS 1801, AS/NZS 2210.3 and AS/NZS 4602.1, as applicable.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment