Roadworks Kerbing and Ground Stabilization Risk Assessment
This risk assessment covers roadworks kerbing and ground stabilisation, including work-zone set-up, traffic interaction, excavation, plant operation, concrete handling and site completion.
Activities covered include
- Set up the site and complete pre-start risk reviews
- Install kerbs and handle concrete products
- Prepare emergency response arrangements and secure the site
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This risk assessment covers roadworks kerbing and ground stabilisation, including work-zone set-up, traffic interaction, excavation, plant operation, concrete handling and site completion. It supports planning and risk management for traffic, services, unstable ground, dust, powered equipment and environmental conditions.
Activities & Risks Covered
This assessment addresses activities and risks including:
- Set up the site and complete pre-start risk reviews
- Manage traffic movements and public access around the work zone
- Locate services and prepare areas for excavation
- Carry out excavation, trenching and edge stability work
- Operate and work around mobile plant and delivery movements
- Install kerbs and handle concrete products
- Handle ground stabilisation materials and manage dust exposure
- Use hand tools and manage noise, vibration and flying particles
- Monitor weather, water, housekeeping and ground conditions
- Prepare emergency response arrangements and secure the site
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out roadworks kerbing and ground stabilisation activities.
Activities & Hazards Covered
| Activity | Potential Hazards |
|---|---|
| Site set-up and pre-start review |
|
| Traffic management and public interface |
|
| Service locating and excavation preparation |
|
| Excavation, trenching and edge stability |
|
| Powered mobile plant and delivery movements |
|
| Kerb installation and concrete handling |
|
| Ground stabilisation materials and dust exposure |
|
| Noise, vibration and hand tool use |
|
| Weather, water, housekeeping and ground conditions |
|
| Emergency response and site security |
|
Need to tailor this risk assessment?
Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:
- Model guidance: Model Code of Practice: Excavation work — 2.3. Controlling the risks; p. 17.
- Model guidance: Model Code of Practice: Managing the work environment and facilities — 2. The work environment; p. 13.
- Model guidance: Model Code of Practice: First aid in the workplace — 3. First aid equipment, facilities and training; p. 12.
- Model guidance: Model Code of Practice: Hazardous manual tasks — 4.1 The hierarchy of control measures; p. 31.
- Model guidance: Model Code of Practice: Managing the risk of fatigue at work — Provide sufficient breaks while at work; p. 30.
- Model guidance: Model Code of Practice: Managing risks of hazardous chemicals in the workplace — 2.2 Safety Data Sheets (SDS); p. 16.
- Model guidance: Model Code of Practice: Managing the risk of falls at workplaces — 3.2 Identifying the hazards; p. 16.
- Model guidance: Model Code of Practice: Construction work — 6.2 Workplace specific induction training; p. 41.
- Model guidance: Model Code of Practice: Work health and safety consultation, cooperation and coordination — 3. What is effective consultation?; p. 13.
- Model guidance: Model Code of Practice: Managing noise and preventing hearing loss at work — 5. Controlling the risks; p. 29.
- Model guidance: Model Code of Practice: How to manage work health and safety risks — 4. Step 3 — How to control risks; p. 20.
- Model guidance: Model Code of Practice: Managing risks of plant in the workplace — Plant used to lift or suspend persons or things; p. 17.
Standard Risk Assessment Features (Click to Expand)
- Activity-specific hazard identification and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each activity
- Risk matrix and assessment classification
- Review, monitoring and sign-off fields
- Site-specific customisation before use
Suitable for Industries
Related templates
$79.50
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
One-time payment