Roadworks Kerbing and Ground Stabilization SWMS

This SWMS covers roadwork planning, traffic control, ground preparation, stabilisation, kerbing, concrete work and site close-out.

Activities covered include

  • Plan the work and brief the work team
  • Construct and compact embankments
  • Inspect, demobilise and sign off the work

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Roadworks Kerbing and Ground Stabilization SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers roadwork planning, traffic control, ground preparation, stabilisation, kerbing, concrete work and site close-out. It supports planning and risk management by addressing traffic, plant, services, excavation, dust, material and environmental hazards.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan the work and brief the work team
  • Establish traffic controls and the work zone
  • Locate services and set out the required alignment
  • Inspect, position and operate plant
  • Strip and prepare land and ground surfaces
  • Carry out ground stabiliser operations
  • Construct and compact embankments
  • Complete soil nailing and slope-support work
  • Excavate and prepare kerb bases
  • Set up formwork and kerbs
  • Deliver, place, finish, cure and cut concrete
  • Inspect, demobilise and sign off the work

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out roadworks, kerbing and ground stabilisation activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Pre-start planning and induction
  • Unplanned work interfaces
  • Incorrect design information
  • Worker unfamiliarity
  • Heat stress and fatigue
  • Emergency response delay
Traffic control and work zone
  • Vehicle intrusion
  • Pedestrian strike
  • Traffic controller exposure
  • Plant and public interaction
  • Night visibility
Services locating and set-out
  • Underground services strike
  • Electric shock
  • Gas release
  • Water-main damage
  • Incorrect kerb alignment
Plant inspection and positioning
  • Plant roll-over
  • Plant collision
  • Swinging counterweight
  • Hydraulic failure
  • Unauthorised plant use
Land reclamation and stripping
  • Soft-ground bogging
  • Unstable fill
  • Buried debris
  • Dust exposure
  • Waterway pollution
  • Plant interaction
Ground stabiliser operations
  • Silica and binder dust
  • Chemical burns
  • Rotating stabiliser rotor
  • Plant collision
  • Flying material
  • Underground services strike
Embankment construction and compaction
  • Embankment collapse
  • Plant roll-over
  • Roller collision
  • Edge drop-off
  • Whole-body vibration
  • Dust and noise
Soil nailing and slope support
  • Slope failure
  • Drill-rig roll-over
  • High-pressure grout release
  • Entanglement in drill rods
  • Underground services strike
  • Falling rock and spoil
Kerb excavation and base preparation
  • Excavation collapse
  • Underground service damage
  • Plant strike
  • Manual handling
  • Uneven ground
  • Compactor vibration
Formwork and kerb setup
  • Formwork collapse
  • Pinch points
  • Trips from stringlines
  • Manual handling strain
  • Plant interaction
  • Sharp edges
Concrete delivery and placement
  • Concrete truck strike
  • Concrete burns
  • Hose whip
  • Pump line failure
  • Silica exposure
  • Slips on wet concrete
Finishing, curing and saw cutting
  • Cuts from saw blade
  • Silica dust
  • Noise
  • Wet concrete dermatitis
  • Trips and slips
  • Premature public access
Inspection, demobilisation and sign-off
  • Residual excavation hazards
  • Plant strike during loading
  • Unstable stockpiles
  • Environmental contamination
  • Unauthorised public access
  • Manual handling

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model Code of Practice: How to manage work health and safety risks; apply the hierarchy of controls, consultation, training, supervision and review requirements.
  • Model Code of Practice: Construction work; prepare, implement and review a SWMS where high risk construction work applies.
  • Model Code of Practice: Managing the risks of plant in the workplace, November 2024; manage collision, overturning, guarding, maintenance and isolation risks for powered mobile plant.
  • Model Code of Practice: Excavation work; plan excavations with services, traffic, ground condition, weather, loading and public safety considered; inspect ground support regularly and after changing conditions.
  • Model Code of Practice: Managing risks of hazardous chemicals in the workplace; maintain effective chemical handling, storage, inspection and control measures.
  • Model Code of Practice: Hazardous manual tasks; design work, use suitable mechanical aids, rotate tasks and manage vibration exposure.
  • Model Code of Practice: Managing the work environment and facilities; manage heat, cold, hydration, rest breaks and weather exposure.
  • AS 1742.3 Manual of uniform traffic control devices, Part 3: Traffic control for works on roads.
  • AS 5488 Classification of subsurface utility information.
  • AS 3798 Guidelines on earthworks for commercial and residential developments.
  • AS 1289 Methods of testing soils for engineering purposes.
  • AS 4678 Earth-retaining structures.
  • AS 4744.1 Steel shoring and trench lining—Design; AS 5047 Hydraulic shoring and trench lining equipment.
  • AS 3610 Formwork for concrete; AS 1379 Specification and supply of concrete; AS 3600 Concrete structures.
  • AS/NZS 1716 Respiratory protective devices; AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment.
  • AS/NZS 1801 Occupational protective helmets; AS/NZS 2210.3 Safety footwear; AS/NZS 4602.1 High visibility safety garments; AS/NZS 1270 Hearing protectors.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections