Excavation Shoring, Benching and Shielding SWMS

This SWMS covers excavation work using shoring, benching and shielding, including installation, use and removal of ground-support measures.
Activities covered include
- Plan excavation work
- Install trench shields
- Backfill, compact and demobilise
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This SWMS covers excavation work using shoring, benching and shielding, including installation, use and removal of ground-support measures. It supports planning and risk management for services, plant, ground movement, protected excavations, backfilling and site close-out.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan excavation work
- Set up the excavation work zone
- Position plant and manage spoil placement
- Excavate and expose services
- Excavate trenches and pits
- Form benches and batters
- Install trench shields
- Install shoring supports
- Work within protected excavations
- Respond to ground movement
- Remove trench supports
- Backfill, compact and demobilise
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out excavation, shoring, benching or shielding work.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan excavation works |
|
| Set up work zone |
|
| Position plant and spoil |
|
| Excavate and expose services |
|
| Excavate trench or pit |
|
| Form benches and batters |
|
| Install trench shields |
|
| Install shoring supports |
|
| Work within protected excavation |
|
| Respond to ground movement |
|
| Remove trench supports |
|
| Backfill and compact |
|
| Demobilise and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: Excavation Work — guidance only; confirm adoption and current status in the relevant jurisdiction.
- Model Code of Practice: Construction Work — guidance for high risk construction work and SWMS requirements.
- Model Code of Practice: Managing the Risks of Plant in the Workplace — guidance for plant selection, inspection, lifting and exclusion zones.
- Model Code of Practice: Managing the Work Environment and Facilities — guidance for access, traffic, lighting and workplace conditions.
- AS 4744.1 Steel shoring and trench lining equipment.
- AS 5047 Hydraulic shoring and trench lining equipment.
- AS 2865 Confined spaces, where the excavation is assessed as a confined space.
- AS/NZS 3012 Electrical installations — construction and demolition sites.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes free branding + 2 years of free updates
$79.50
$96.80
Free branding + 2 years of updates