Excavation Work Over 1.5 SWMS
This SWMS covers excavation work over 1.5 metres, including planning, excavation, ground support, access and reinstatement.
Activities covered include
- Plan excavation work and identify site conditions
- Excavate the initial cut and manage spoil
- Backfill, compact, reinstate and demobilise the site
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers excavation work over 1.5 metres, including planning, excavation, ground support, access and reinstatement. It supports managing underground services, changing ground conditions, plant movement, falls, water ingress and work within the excavation.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan excavation work and identify site conditions
- Locate underground services before work starts
- Establish exclusion zones and control site access
- Inspect and position plant and equipment safely
- Excavate the initial cut and manage spoil
- Install ground support systems
- Provide safe access to the excavation
- Manage work within the excavation and inspect changing conditions
- Backfill, compact, reinstate and demobilise the site
Who is this for?
For contractors, workers, supervisors and businesses carrying out excavation work over 1.5 metres.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan excavation works |
|
| Locate underground services |
|
| Establish site exclusion zone |
|
| Inspect plant and equipment |
|
| Position plant safely |
|
| Excavate initial cut |
|
| Install ground support |
|
| Provide trench access |
|
| Work within excavation |
|
| Inspect changing conditions |
|
| Backfill and compact |
|
| Reinstate and demobilise |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model WHS Regulations guidance: excavation-work risk management, underground essential-services information, trench access control, trench-collapse controls, high-risk construction work, SWMS and emergency plans. Model provisions require risks from falls, collapse, falling objects and airborne contaminants to be managed, and require trenches at least 1.5 m deep to be secured and supported by shoring, shielding, benching or battering unless supported by current written geotechnical advice.
- Model Code of Practice: Excavation Work, used as guidance and adopted or varied in relevant jurisdictions; includes planning, services location, trench support, access, inspections and emergency arrangements.
- Model Code of Practice: Construction Work, used as guidance for high-risk construction work and SWMS preparation.
- AS 4744.1 Series: Steel shoring and trench lining equipment.
- AS 3798: Guidelines on earthworks for commercial and residential developments.
- AS/NZS 2865: Confined spaces, where the excavation is assessed as a confined space.
- AS/NZS 3012: Electrical installations—Construction and demolition sites.
- AS 1742.3: Manual of uniform traffic control devices—Traffic control for works on roads.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment