BlueSafe

Tile Removal and Demolition Risk Assessment

This risk assessment covers tile removal and demolition activities, including planning, service isolation, work area control, demolition, dust management and waste handling.

Activities covered include

  • Review the site, work scope, potential instability, services and emergency arrangements
  • Manage dust, silica and other airborne contaminants
  • Respond to emergencies and review controls as conditions change

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Tile Removal and Demolition Risk Assessment
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This risk assessment covers tile removal and demolition activities, including planning, service isolation, work area control, demolition, dust management and waste handling. It supports planning and risk management for changing conditions, debris, sharp materials, airborne contaminants, tools, plant and emergency events.

Activities & Risks Covered

This assessment addresses activities and risks including:

  • Review the site, work scope, potential instability, services and emergency arrangements
  • Isolate services and complete pre-start checks
  • Set up barricades, exclusion zones and clear site boundaries
  • Remove tiles and carry out manual demolition work
  • Manage dust, silica and other airborne contaminants
  • Work around elevated areas, edges and fragile surfaces
  • Use demolition plant, tools and equipment
  • Handle, load, transport and segregate demolition waste
  • Respond to emergencies and review controls as conditions change

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out tile removal or demolition activities.

Activities & Hazards Covered

Activity Potential Hazards
Planning, site review and scope confirmation
  • Unidentified structural instability
  • Hidden services and live utilities
  • Unidentified asbestos or hazardous materials
  • Poor coordination with other trades or occupants
  • Inadequate emergency arrangements
Isolation of services and pre-start checks
  • Electric shock or arc flash
  • Gas leak or fire
  • Water release causing slip or electrical risk
  • Unexpected activation of alarms or building systems
  • Damaged leads or unsafe electrical tools
Work area set-up, barricading and exclusion zones
  • Unauthorised entry into the demolition area
  • Exposure of workers or the public to falling debris
  • Interaction with mobile plant or waste removal vehicles
  • Poor visibility of hazards and site boundaries
Tile removal and manual demolition activities
  • Cuts and lacerations from sharp tile edges
  • Flying fragments and falling debris
  • Musculoskeletal strain from repetitive lifting and awkward postures
  • Unexpected collapse of brittle or loosened sections
  • Hand-arm vibration from powered hand tools
Dust, silica and airborne contaminants
  • Respirable crystalline silica from tiles, mortar, screed or concrete
  • Dust inhalation and reduced visibility
  • Exposure to hazardous residues, mould, lead or contaminated dust
  • Contamination of adjacent occupied areas
Work at height, edges and fragile surfaces
  • Falls from ladders, platforms or edges
  • Collapse of fragile surfaces or degraded substrates
  • Falling tools and materials onto persons below
  • Unsafe access to elevated work areas
Plant, tools and equipment use
  • Contact with moving parts
  • Kickback or loss of control of tools
  • Noise-induced hearing damage
  • Equipment failure during demolition
  • Plant collision in confined areas
Waste handling, loading and disposal
  • Manual handling injuries from heavy rubble bags or broken tiles
  • Cuts from sharp debris
  • Trips from debris accumulation
  • Unstable waste loads and falling materials during transport
  • Incorrect segregation of hazardous waste
Emergency response, review and change management
  • Injury with delayed response
  • Fire or smoke during demolition
  • Unexpected asbestos discovery
  • Unplanned structural movement or collapse
  • Controls becoming ineffective as the work changes

Need to tailor this risk assessment?

Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:

  • Model guidance: Model Code of Practice: Demolition work — 3. Planning the demolition work; p. 18.
  • Model guidance: Model Code of Practice: How to manage and control asbestos in the workplace — 2.1. What is involved in managing risks?; p. 12.
  • Model guidance: Model Code of Practice: Hazardous manual tasks — 4.1 The hierarchy of control measures; p. 31.
  • Model guidance: Model Code of Practice: Managing electrical risks in the workplace — 2.1 Identifying the hazards; p. 14.
  • Model guidance: Model Code of Practice: Managing the work environment and facilities — 2. The work environment; p. 13.
  • Model guidance: Model Code of Practice: Construction work — 6.2 Workplace specific induction training; p. 41.
  • Model guidance: Model Code of Practice: Managing noise and preventing hearing loss at work — 5. Controlling the risks; p. 29.
  • Model guidance: Model Code of Practice: Managing risks of plant in the workplace — Plant hazard identification — Traffic movements in the workplace; p. 17.
  • Model guidance: Model Code of Practice: How to manage work health and safety risks — 2. Step 1 — How to identify hazards; p. 12.
  • Model guidance: Model Code of Practice: Managing the risk of falls at workplaces — 3.2 Identifying the hazards; p. 16.
  • Model guidance: Model Code of Practice: Work health and safety consultation, cooperation and coordination — 3. What is effective consultation?; p. 13.
  • Model guidance: Model Code of Practice: First aid in the workplace — 3. First aid equipment, facilities and training; p. 12.

Standard Risk Assessment Features (Click to Expand)
  • Activity-specific hazard identification and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each activity
  • Risk matrix and assessment classification
  • Review, monitoring and sign-off fields
  • Site-specific customisation before use

Suitable for Industries

Building and ConstructionDemolitionFlooring and Tiling

Related templates

$79.50

One-time payment