BlueSafe
Tile Removal and Demolition SWMS

Tile Removal and Demolition SWMS

  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content – Ready to Deploy Immediately
  • Customisable – Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Tile Removal and Demolition SWMS

Product Overview

This Tile Removal and Demolition Safe Work Method Statement (SWMS) is developed to help PCBUs, contractors and workers safely plan and carry out tile demolition works while maintaining strong WHS compliance. It is a comprehensive document that covers multiple aspects of tile removal and demolition activities, from preparation and isolation through to waste handling and site clean-up.

Activities & Specific Tasks Covered

This document includes specific risk controls for:

  • Chiselling tiles off walls, including safe use of hand tools and powered chisels to minimise flying debris and impact injuries
  • Cutting out old grout with manual and powered tools, managing dust, vibration and noise exposure
  • Removing ceramic or stone floor tiles, including manual handling techniques, trip hazard control and floor stability checks
  • Wrapping tiles in a blanket or similar material before breaking to control flying fragments and sharp edge risks
  • Selection and use of appropriate personal protective equipment (PPE) such as eye, respiratory, hand, foot and hearing protection
  • Identification and control of hazardous materials, including potential asbestos-containing materials, silica dust and lead-based products
  • Use of dust suppression methods, local exhaust ventilation and housekeeping to reduce airborne contaminants and maintain clear access ways
  • Safe operation of powered demolition tools (e.g. jackhammers, rotary hammers, grinders) including cord management and lock-out procedures
  • Manual handling of debris, rubble and waste bins to reduce the risk of strains, sprains and crush injuries
  • Segregation, stacking and disposal of broken tiles and rubble to avoid collapse, cuts and puncture wounds
  • Noise and vibration management, including exposure limits, task rotation and tool maintenance
  • Site set-up, barricading, signage and exclusion zones to protect other workers and members of the public from demolition hazards
  • Emergency response procedures for lacerations, eye injuries, dust inhalation and structural damage incidents

Who is this for?

This SWMS is designed for tilers, demolition contractors, bathroom and kitchen renovators, builders, maintenance teams and site supervisors involved in tile removal and associated demolition works.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Pre-start planning and assessment
  • • Unidentified asbestos in tiles or adhesives
  • • Lead-based paint on tiled surfaces
  • • Hidden electrical services in walls and floors
  • • Hidden plumbing services behind tiles
  • • Inadequate site access and egress
  • • Insufficient ventilation in work area
Site isolation and public protection
  • • Unauthorised entry to work area
  • • Public exposure to dust and noise
  • • Trip hazards in access ways
  • • Obstructed emergency exits
Set up tools and electrical safety
  • • Electric shock from powered tools
  • • Tool failure under load
  • • Trip hazards from leads and hoses
  • • Noise exposure from power tools
Personal protective equipment setup
  • • Eye injury from flying fragments
  • • Respiratory irritation from silica and dust
  • • Hand lacerations from sharp tile edges
  • • Foot injury from dropped tiles and tools
Wrapping tiles in blanket before breaking
  • • Flying fragments during tile breaking
  • • Manual handling strain from lifting bundles
  • • Entanglement with blanket material
  • • Trip hazards from loose blankets
Chiselling tiles off walls
  • • Falling wall tiles
  • • Impact from chisels and hammers
  • • Damage to hidden services in walls
  • • Working at height on stepladders
Cutting out old grout
  • • Silica dust from grout cutting
  • • Kickback from power tools
  • • Damage to waterproofing membranes
  • • Noise exposure above safe levels
Removing ceramic or stone floor tiles
  • • Flying fragments from floor tiles
  • • Slips and trips on uneven surfaces
  • • Musculoskeletal strain from prying tiles
  • • Noise and vibration from jackhammers
Handling and stacking removed tiles
  • • Cuts from sharp tile edges
  • • Overexertion from lifting heavy loads
  • • Stack collapse onto workers
  • • Foot injuries from dropped tiles
Waste containment and dust control
  • • Airborne dust from debris
  • • Contact with sharp waste in bins
  • • Overloaded waste containers
  • • Manual handling of heavy waste bags
Working at heights around tiled areas
  • • Falls from ladders or platforms
  • • Objects falling from height
  • • Instability of temporary platforms
  • • Contact with overhead fixtures
Noise, vibration and fatigue management
  • • Excessive noise exposure
  • • Hand-arm vibration
  • • Fatigue from repetitive work
  • • Reduced concentration leading to errors
Housekeeping and post-work inspection
  • • Residual sharp fragments on floor
  • • Dust left on surfaces and in air
  • • Unsecured tools and materials
  • • Unreported damage to structure or services

Need to add specific site requirements?

Don't worry if a specific job step isn't listed above. Once you purchase, simply log in to your Client Portal and add your own custom job steps at no extra cost. We take care of the hard work—creating the hazards and control measures for free—to ensure your document is compliant within minutes.

Legislation & References

This document was researched and developed to align with:

  • Model Code of Practice: How to Safely Remove Asbestos – where asbestos-containing materials may be present in older tile systems and adhesives
  • Model Code of Practice: Managing the Risk of Respirable Crystalline Silica from Engineered Stone in the Workplace – guidance relevant to controlling silica dust generated during cutting and demolishing tiles and grout
  • Model Code of Practice: Managing Noise and Preventing Hearing Loss at Work – for controlling noise exposure from powered demolition tools
  • Model Code of Practice: Hazardous Manual Tasks – for managing risks associated with lifting, carrying and handling tiles and rubble
  • Model Code of Practice: Managing the Work Environment and Facilities – for maintaining safe access, egress and housekeeping during demolition activities
  • Model Code of Practice: Construction Work – for general construction and demolition WHS requirements
  • AS/NZS 1715: Selection, Use and Maintenance of Respiratory Protective Equipment – for choosing and managing respirators used during dusty tile removal tasks
  • AS/NZS 2161: Occupational Protective Gloves – for appropriate hand protection against sharp tiles and tools
  • AS/NZS 1337.1: Personal Eye Protection – for eye protection against flying tile fragments and dust
  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2017

Standard SWMS Features (Click to Expand)
  • Operational guidelines, with a step-by-step approach to safe work
  • Possible hazards that may be encountered
  • Step-by-step safety procedures to follow
  • Before work starts – Guidelines and Checks
  • Safety measures and guides
  • Operational Safety Checks
  • Before and After Risk Ratings
  • Risk Assessment Matrix
  • High Risk Work Involved
  • Emergency Evacuation Procedure
  • Plant and Equipment
  • Qualifications and Permits
  • Specific Personal Protective Equipment (PPE)
  • Company Personnel Sign-off form

$96.8

Safe Work Australia Aligned