BlueSafe

Floor Stripping Removal and Surface Preparation SWMS

This SWMS covers floor stripping, removal and surface preparation work, including isolation, removal, grinding, repair, levelling, curing and handover.

Activities covered include

  • Review the scope, site information and potential material conditions
  • Grind and profile substrates while managing rotating equipment, dust and noise
  • Clean up waste, demobilise and communicate residual hazards at handover

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Floor Stripping Removal and Surface Preparation SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers floor stripping, removal and surface preparation work, including isolation, removal, grinding, repair, levelling, curing and handover. It supports planning work steps and managing hazards from unknown materials, dust, chemicals, electrical equipment, moving plant and manual handling.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review the scope, site information and potential material conditions
  • Establish work-area isolation and manage access, pedestrian, dust and chemical hazards
  • Inspect plant and electrical equipment before use
  • Remove carpet, underlay, vinyl, linoleum, tiles and rigid flooring
  • Strip residual adhesives and manage vapour, chemical and dust hazards
  • Grind and profile substrates while managing rotating equipment, dust and noise
  • Repair uneven floors and manage trip, substrate and plant-interaction risks
  • Mix self-levelling compound and manage dust, skin, eye and mixer hazards
  • Pour and smooth compound while managing wet-surface and access hazards
  • Cure and inspect the surface, including corrective grinding where needed
  • Clean up waste, demobilise and communicate residual hazards at handover

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out floor stripping, removal and surface preparation activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review scope and site information
  • Unidentified asbestos-containing material
  • Unknown substrate condition
  • Conflicting trades
  • Inadequate work planning
Establish work area isolation
  • Unauthorised entry
  • Pedestrian collision
  • Slips on wet floor
  • Exposure to dust and chemicals
Inspect plant and electrical equipment
  • Electric shock
  • Entanglement in moving parts
  • Plant malfunction
  • Noise and vibration
Remove carpet and underlay
  • Manual handling strain
  • Cuts from knives
  • Dust and biological contamination
  • Trips from rolled material
Lift vinyl and linoleum
  • Asbestos fibre release
  • Chemical exposure
  • Cuts and punctures
  • Manual handling strain
Remove tiles and rigid flooring
  • Flying tile fragments
  • Respirable silica dust
  • Asbestos fibre release
  • Noise and vibration
  • Sharp edges
Strip residual adhesives
  • Hazardous chemical vapours
  • Skin and eye burns
  • Flammable vapours
  • Respirable dust
Grind and profile substrate
  • Respirable crystalline silica
  • Airborne dust
  • Contact with rotating disc
  • Electric shock
  • Noise and vibration
Repair uneven warehouse floors
  • Trip hazards
  • Concrete dust
  • Manual handling strain
  • Forklift interaction
  • Unstable substrate
Mix self-levelling compound
  • Cement dust inhalation
  • Caustic skin burns
  • Eye injury
  • Entanglement with mixer
  • Manual handling strain
Pour and smooth compound
  • Slips on wet compound
  • Cement contact dermatitis
  • Trips on tools and leads
  • Manual handling strain
  • Unauthorised entry
Cure and inspect surface
  • Premature traffic on floor
  • Slip hazards
  • Defective surface
  • Dust from corrective grinding
Clean up and dispose waste
  • Dust re-suspension
  • Chemical spill
  • Manual handling strain
  • Waste contamination
  • Plant-pedestrian collision
Demobilise and hand over
  • Residual trip hazards
  • Unauthorised plant use
  • Incomplete isolation removal
  • Uncommunicated defects

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model Code of Practice: Construction work.
  • Model Code of Practice: Managing risks of hazardous chemicals in the workplace.
  • Model Code of Practice: Managing the risks of respirable crystalline silica from engineered stone in the workplace, where applicable, and guidance in Working safely when cutting, drilling and grinding concrete and masonry products.
  • Model Code of Practice: How to safely remove asbestos.
  • Model Code of Practice: Managing noise and preventing hearing loss at work.
  • Model Code of Practice: Hazardous manual tasks.
  • AS/NZS 1715 and AS/NZS 1716 Respiratory protective equipment.
  • AS/NZS 1270 Hearing protectors.
  • AS/NZS 1337.1 Personal eye protection.
  • AS/NZS 2210.3 Safety footwear.
  • AS/NZS 3760 In-service safety inspection and testing of electrical equipment.
  • AS/NZS 3580.9.6 Respirable dust sampling, where exposure monitoring is required.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionFlooring and TilingCommercial CleaningHandyman and Property Maintenance

Related templates

$79.50

$96.80

Save $17.30

One-time payment