Steel Fixing Reinforcement and Post-Tensioning Risk Assessment

This risk assessment covers steel fixing, reinforcement and post-tensioning activities, from planning and material movement through to placement, stressing, inspection and concrete-pour interfaces.
Activities covered include
- Plan work sequencing, site readiness, access and exclusion areas
- Work around formwork, temporary supports and structural interfaces
- Coordinate inspections, concrete placement interfaces and emergency response
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This risk assessment covers steel fixing, reinforcement and post-tensioning activities, from planning and material movement through to placement, stressing, inspection and concrete-pour interfaces. It supports planning and risk management by identifying hazards from stored energy, manual tasks, protruding steel, temporary supports, plant, services and changing site conditions.
Activities & Risks Covered
This assessment addresses activities and risks including:
- Plan work sequencing, site readiness, access and exclusion areas
- Deliver, unload and move reinforcement and associated gear
- Manually handle bars, mesh, coils, anchors, tools and tie wire
- Cut, bend and fabricate reinforcement
- Place and fix reinforcement in slabs, walls, columns and beams
- Work around formwork, temporary supports and structural interfaces
- Handle post-tensioning materials, tendons and stressing equipment
- Work around plant, craneage and suspended loads
- Manage electrical, environmental and adjacent service hazards
- Coordinate inspections, concrete placement interfaces and emergency response
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out steel fixing, reinforcement and post-tensioning activities.
Activities & Hazards Covered
| Activity | Potential Hazards |
|---|---|
| Planning, coordination and site readiness |
|
| Delivery, unloading and movement of reinforcement and gear |
|
| Manual handling of bars, mesh, coils, anchors and tools |
|
| Cutting, bending and fabrication activities |
|
| Placement and fixing of reinforcement in slabs, walls, columns and beams |
|
| Work around formwork, temporary supports and structural interfaces |
|
| Post-tensioning materials, tendons and stressing equipment |
|
| Plant, craneage and suspended load interactions |
|
| Electrical, environmental and adjacent service hazards |
|
| Inspection, concrete pour interface and emergency response |
|
Need to tailor this risk assessment?
Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:
- Model guidance: Model Code of Practice: Managing the work environment and facilities — 2. The work environment; p. 13.
- Model guidance: Model Code of Practice: Managing risks of plant in the workplace — Plant used to lift or suspend persons or things; p. 17.
- Model guidance: Model Code of Practice: Managing the risk of falls at workplaces — 3.2 Identifying the hazards; p. 16.
- Model guidance: Model Code of Practice: Hazardous manual tasks — 4.1 The hierarchy of control measures; p. 31.
- Model guidance: Model Code of Practice: First aid in the workplace — 3. First aid equipment, facilities and training; p. 12.
- Model guidance: Model Code of Practice: Managing the risk of fatigue at work — Provide sufficient breaks while at work; p. 30.
- Model guidance: Model Code of Practice: Managing electrical risks in the workplace — 2.1 Identifying the hazards; p. 14.
- Model guidance: Model Code of Practice: Managing noise and preventing hearing loss at work — 5. Controlling the risks; p. 29.
- Model guidance: Model Code of Practice: How to manage work health and safety risks — 5. Step 4 — How to review controls; p. 27.
Standard Risk Assessment Features (Click to Expand)
- Activity-specific hazard identification and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each activity
- Risk matrix and assessment classification
- Review, monitoring and sign-off fields
- Site-specific customisation before use
Suitable for Industries
Related templates
$79.50
Includes free branding + 2 years of free updates
$79.50
Free branding + 2 years of updates