Steel Fixing SWMS

This SWMS covers steel fixing work from planning and material handling through to installation, inspection and concrete pour interfaces.

Activities covered include

  • Review drawings and the SWMS before work starts
  • Fix reinforcement for beams and footings
  • Clean up and demobilise the work area

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Steel Fixing SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers steel fixing work from planning and material handling through to installation, inspection and concrete pour interfaces. It supports work planning and risk management for formwork, reinforcement, cutting, tying, access and cleanup.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review drawings and the SWMS before work starts
  • Establish the work area and manage access
  • Inspect formwork and access arrangements
  • Receive, unload, store and stage reinforcement
  • Cut and bend reinforcement
  • Install slab reinforcement
  • Fix reinforcement for beams and footings
  • Fix vertical reinforcement
  • Tie cages and couplers
  • Inspect reinforcement before the concrete pour
  • Manage the concrete pour interface
  • Clean up and demobilise the work area

Who is this for?

For contractors, workers, supervisors and businesses carrying out steel fixing work.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review drawings and SWMS
  • Incorrect reinforcement placement
  • Unplanned high-risk work
  • Conflicting trades
  • Inadequate worker competency
Establish work area
  • Unauthorised entry
  • Trips from loose materials
  • Plant-pedestrian interaction
  • Falls through openings
  • Overhead work
Inspect formwork and access
  • Formwork collapse
  • Falls from incomplete deck
  • Falling objects
  • Unstable work platform
  • Impalement on starter bars
Receive and unload reinforcement
  • Crush from suspended load
  • Struck by mobile plant
  • Load shift from stillage
  • Failure of lifting gear
  • Sharp steel edges
Store and stage steel
  • Rolling reinforcement bundles
  • Collapsed material stack
  • Manual handling strain
  • Trips on reinforcement
  • Overloaded formwork
Cut and bend reinforcement
  • Entanglement in machinery
  • Flying steel fragments
  • Cuts from sharp edges
  • Noise exposure
  • Electric shock
  • Silica dust from drilling
Install slab reinforcement
  • Musculoskeletal strain
  • Trips on mesh and bar
  • Cuts from tie wire
  • Falls through openings
  • Mesh movement
  • Hand crush injuries
Fix beams and footings
  • Awkward manual handling
  • Falls into excavations
  • Impalement on starter bars
  • Collapse of reinforcement cage
  • Trips on uneven ground
Fix vertical reinforcement
  • Fall from height
  • Impalement on protruding bars
  • Unstable reinforcement cage
  • Falling tools and materials
  • Crush from lifted cage
  • Overreaching from ladders
Tie cages and couplers
  • Hand punctures
  • Repetitive strain
  • Incorrect coupler installation
  • Cage instability
  • Dropped hand tools
Inspect before concrete pour
  • Incorrect reinforcement cover
  • Unstable steel during pour
  • Trips during inspection
  • Plant interaction
  • Uncontrolled changes
Manage concrete pour interface
  • Strike from pump hose
  • Steel displacement
  • Slips on wet concrete
  • Falls from slab edge
  • Contact with concrete
  • Plant interaction
Clean up and demobilise
  • Cuts from offcuts
  • Trips from waste
  • Manual handling strain
  • Plant interaction
  • Unprotected starter bars

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model Code of Practice: Construction Work, as adopted or applied in the relevant jurisdiction.
  • Model Code of Practice: Managing the Risk of Falls at Workplaces, as adopted or applied in the relevant jurisdiction. Guidance for fall prevention, working platforms, edge protection and rescue planning is also reflected in the Steel Construction Code of Practice.
  • Model Code of Practice: Managing Risks of Plant in the Workplace, as adopted or applied in the relevant jurisdiction.
  • Model Code of Practice: Hazardous Manual Tasks, as adopted or applied in the relevant jurisdiction.
  • Model Code of Practice: Managing the Work Environment and Facilities, as adopted or applied in the relevant jurisdiction.
  • Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace, as adopted or applied in the relevant jurisdiction.
  • Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements Code of Practice, where adopted or applicable; use the hierarchy of controls, documented controls, training and monitoring arrangements where silica processing is high risk.
  • Steel Construction Code of Practice 2004 as technical guidance for falls, falling objects, structural stability, lifting and exclusion zones.
  • AS/NZS 1576 series Scaffolding; AS 4576 Guidelines for scaffolding; AS 1657 Fixed platforms, walkways, stairways and ladders; AS/NZS 1891 series Industrial fall-arrest systems and devices; AS/NZS 5532 Single-point anchor devices.
  • AS 1418 series Cranes, hoists and winches; AS 2550 series Cranes, hoists and winches—Safe use; AS 4991 Lifting devices; AS 3775 Chain slings; AS 1353 Flat synthetic-webbing slings; AS 1666.1 Wire-rope slings.
  • AS/NZS 3012 Electrical installations—Construction and demolition sites; AS/NZS 60745 or AS/NZS 62841 for portable electric tools; AS/NZS 1715 and AS/NZS 1716 for respiratory protective equipment.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections