Wood Staining French Polishing Varnishing SWMS
This SWMS covers planning, preparing, staining, polishing, sealing and finishing timber surfaces.
Activities covered include
- Plan the work, select suitable products and communicate site controls
- Mix stains and tints and manage vapours, contact and spills
- Complete final clean-up, identify residual hazards and hand over the area
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers planning, preparing, staining, polishing, sealing and finishing timber surfaces. It supports work planning and risk management for chemical exposure, flammable materials, dust, tools, spills, waste and final handover.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the work, select suitable products and communicate site controls
- Set up a controlled work area with clear access and ventilation considerations
- Inspect tools, leads and equipment before use
- Handle timber and materials while managing lifting, splinters and dropped-load risks
- Prepare timber surfaces, including sanding and contamination control
- Mix stains and tints and manage vapours, contact and spills
- Apply bleach, preservative, stains and sealers to timber
- French polish surfaces and apply lacquer, varnish or oil finishes
- Clean tools and equipment and manage solvent exposure
- Store and remove chemical, coating and combustible waste
- Complete final clean-up, identify residual hazards and hand over the area
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out timber staining, French polishing, varnishing and related finishing activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Pre-start planning |
|
| Set up work area |
|
| Inspect tools and leads |
|
| Handle timber and materials |
|
| Prepare timber surfaces |
|
| Mix stains and tints |
|
| Apply bleach or preservative |
|
| Stain and seal timber |
|
| French polish surfaces |
|
| Apply lacquer and varnish |
|
| Apply oil finishes |
|
| Clean tools and equipment |
|
| Waste removal and storage |
|
| Final clean-up and handover |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- WHS Act section 19 - primary duty of care.
- WHS Regulations clauses 32-38 - duty to identify hazards, manage risks and apply the hierarchy of control.
- WHS Regulation clause 39 - information, training, instruction and supervision.
- WHS Regulation clause 44 - provision and use of personal protective equipment. Supported by AS/NZS 1715, AS/NZS 1716, AS/NZS 1337.1, AS/NZS 2161 and AS/NZS 2210.1.
- WHS Regulation clause 49 - ensure exposure standards for airborne contaminants are not exceeded; use ventilation and monitoring where required.
- WHS Regulation clause 51 - manage risks associated with ignition sources and hazardous atmospheres.
- WHS Regulation clause 52 - ignition sources.
- WHS Regulation clause 53 - flammable and combustible materials not to be accumulated.
- WHS Regulation clause 60 - hazardous manual tasks.
- WHS Regulation clause 78 - management of risk of falls.
- WHS Regulations Chapter 7 - hazardous chemicals, including labelling, SDS, storage and handling.
- WHS Regulation clause 355 - specific control of fire and explosion for hazardous chemicals.
- Code of Practice: Managing risks of hazardous chemicals in the workplace.
- Code of Practice: Spray painting and powder coating.
- AS 1940 The storage and handling of flammable and combustible liquids.
- AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment and AS/NZS 1716 Respiratory protective devices.
- AS/NZS 4114 Spray painting booths, designated spray painting areas and paint mixing rooms, where spray finishing is used.
- AS/NZS 3760 in-service safety inspection and testing of electrical equipment where portable tools and leads are used.
- AS/NZS 1892 portable ladders, where ladders are used for access or light-duty finishing work.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment