BlueSafe

Wall and Floor Tiling Ceramic and Stone SWMS

This SWMS covers ceramic and stone wall and floor tiling from site setup and substrate preparation through to finishing and handover.

Activities covered include

  • Set up the site, exclusions, access and work areas
  • Mix adhesives and grout while managing dust, skin contact, mixers and electricity
  • Manage pool or outdoor tiling conditions, then clean up and hand over

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Wall and Floor Tiling Ceramic and Stone SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers ceramic and stone wall and floor tiling from site setup and substrate preparation through to finishing and handover. It supports planning and risk management for materials, dust, access, cutting, adhesives, wet areas and clean-up.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Set up the site, exclusions, access and work areas
  • Deliver and handle materials while managing lifting, crush and walkway risks
  • Inspect equipment and controls before starting work
  • Inspect and prepare substrates, including dust, hidden-service and surface hazards
  • Set out tile patterns while managing posture, tools and alignment
  • Access difficult areas while managing falls, overreaching and dropped items
  • Mix adhesives and grout while managing dust, skin contact, mixers and electricity
  • Cut and shape tiles while managing dust, sharp edges, fragments, noise and vibration
  • Apply waterproofing interfaces while managing chemicals and wet surfaces
  • Lay floor and wall tiles while managing adhesive, handling, posture and falling-tile risks
  • Grout, patch, seal and caulk finished surfaces
  • Manage pool or outdoor tiling conditions, then clean up and hand over

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out ceramic or stone wall and floor tiling activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Site setup and exclusions
  • Unauthorised access
  • Slip and trip hazards
  • Poor access and egress
  • Contact with occupants or other trades
Materials delivery and handling
  • Musculoskeletal strain
  • Crush from falling boxes
  • Cuts from packaging and edges
  • Blocked walkways
Pre-start equipment checks
  • Electric shock
  • Plant malfunction
  • Dust extraction failure
  • Noise exposure
Substrate inspection and prep
  • Silica dust from abrading
  • Contact with hidden services
  • Slips on contaminated floors
  • Skin contact with primers
Set out tile pattern
  • Awkward postures
  • Trips from lines and tools
  • Rework from poor alignment
  • Cuts from sample cuts
Access difficult areas
  • Fall from height
  • Overreaching
  • Platform instability
  • Dropped tiles or tools
Mix adhesives and grout
  • Cement burns
  • Dust inhalation
  • Entanglement in mixer
  • Electric shock from mixer
Cut and shape tiles
  • Silica dust
  • Lacerations from sharp edges
  • Eye injury from fragments
  • Noise and vibration
Apply waterproofing interfaces
  • Chemical exposure
  • Slips on wet membrane
  • Poor bond from contamination
  • Confined wet-area access
Lay floor tiles
  • Kneeling strain
  • Slip on wet adhesive
  • Incorrect falls in wet areas
  • Manual handling of large-format tiles
Lay wall tiles
  • Falling tiles
  • Adhesive contact
  • Overhead work strain
  • Poor adhesion from skinning
Grout joints and patching
  • Wet surface slips
  • Skin and eye irritation
  • Repetitive hand strain
  • Damage to finished tiles
Seal and caulk finishes
  • Chemical vapours
  • Flammable products
  • Poor indoor air quality
  • Skin contact with sealants
Pool and outdoor tiling
  • Fall into water
  • Sun and heat exposure
  • Slippery wet edges
  • Weather affecting bond
Clean-up and handover
  • Residual sharp waste
  • Dust during clean-up
  • Chemical waste
  • Trips during demobilisation

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Work Health and Safety Act 2011 (or equivalent state/territory WHS Act): primary duty of care, consultation, information, training, instruction and supervision.
  • Work Health and Safety Regulations 2011/2022/2025 (jurisdiction as applicable): regs 34-38 risk management; construction work and SWMS for high risk construction work; hazardous manual tasks; falls; electrical risks; hazardous chemicals; PPE; airborne contaminants; health monitoring where required.
  • Crystalline silica regulations and codes: processing of crystalline silica substances must be controlled; use wet methods, on-tool extraction, local exhaust ventilation, isolation and compliant respiratory protection where needed. Ceramic wall and floor tiles are not engineered stone, but tiles and substrates may still contain crystalline silica.
  • Code of Practice: Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements / Managing risks of respirable crystalline silica in the workplace — training, supervision, air monitoring and review of controls for silica-generating tasks.
  • Code of Practice: Managing risks of hazardous chemicals in the workplace — SDS, labelling, storage, handling and ventilation for adhesives, sealers, primers and cleaning chemicals.
  • Code of Practice: Hazardous manual tasks — identify and control lifting, carrying, kneeling, repetitive movement and awkward postures associated with tiling work.
  • Code of Practice: Managing the risk of falls at workplaces / in housing construction — apply hierarchy of controls, inspect controls and use SWMS where high risk construction work applies.
  • Code of Practice: Construction work — worker consultation, safe access/egress, site supervision, inductions and SWMS requirements.
  • AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment; AS/NZS 1716 Respiratory protective devices.
  • AS/NZS 60335.2.69 for H-class vacuums used for hazardous dust collection.
  • AS/NZS 3012 Electrical installations - construction and demolition sites; AS/NZS 3760 in-service safety inspection and testing of electrical equipment.
  • AS/NZS 4576 Guidelines for scaffolding; applicable manufacturer instructions for trestles, platforms, mobile scaffolds, tile saws, grinders, mixers and sealant products.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionFlooring and TilingHandyman and Property MaintenanceShopfitting and Cabinet Making

Related templates

$79.50

$96.80

Save $17.30

One-time payment