BlueSafe

Tower Crane Assembly - Dismantling SWMS

This SWMS covers tower crane assembly dismantling activities, from planning and exclusion zones through to component loading and site sign-off.

Activities covered include

  • Plan the dismantling sequence and site arrangements
  • Access crane areas at height
  • Load, secure and demobilise crane components

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Tower Crane Assembly - Dismantling SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers tower crane assembly dismantling activities, from planning and exclusion zones through to component loading and site sign-off. It supports work planning and risk management by addressing hazards associated with crane stability, work at height, lifting, energy isolation and site movement.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan the dismantling sequence and site arrangements
  • Set up exclusion zones and control access
  • Inspect the crane, lifting gear and components
  • Position the assist mobile crane
  • Isolate crane energy sources
  • Access crane areas at height
  • Remove loose equipment, ties and braces
  • Dismantle the jib, counter-jib and counterweights
  • Remove tower sections in sequence
  • Load, secure and demobilise crane components

Who is this for?

For contractors, workers, supervisors and businesses involved in tower crane dismantling activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan dismantling works
  • Crane collapse
  • Unplanned dismantling sequence
  • Falling components
  • Inadequate rescue response
  • Unauthorised work
Establish site exclusion zones
  • Public entry
  • Crush from falling parts
  • Plant-pedestrian collision
  • Unauthorised crane access
  • Vehicle intrusion
Inspect crane and lifting gear
  • Structural component failure
  • Defective lifting gear
  • Hydraulic failure
  • Dropped load
  • Stored energy release
Position assist mobile crane
  • Mobile crane overturn
  • Ground bearing failure
  • Crush from counterweight
  • Overhead powerline contact
  • Reversing collision
Isolate crane energy sources
  • Electric shock
  • Unexpected crane movement
  • Stored hydraulic energy
  • Unauthorised energisation
  • Fire from electrical fault
Access crane at height
  • Fall from ladder
  • Fall from boom
  • Dropped tools
  • Fatigue during climbing
  • Suspension trauma
Remove loose crane equipment
  • Falling objects
  • Manual handling strain
  • Unexpected movement
  • Sharp edges
  • Dropped electrical items
Remove crane ties and braces
  • Tower instability
  • Structural collapse
  • Fall from height
  • Dropped tie components
  • Crush from released loads
Dismantle jib and counter-jib
  • Boom collapse
  • High-reach suspended load
  • Crush from swinging load
  • Fall from boom
  • Rigging failure
Remove counterweights safely
  • Crane overturn
  • Counterweight drop
  • Crush injury
  • Incorrect removal sequence
  • Sling failure
Dismantle tower sections
  • Tower collapse
  • Falling tower section
  • Pinch points
  • Fall from height
  • Crane collision
Load and secure components
  • Load shift on truck
  • Vehicle strike
  • Manual handling injury
  • Dropped components
  • Traffic interaction
Demobilise and sign off
  • Residual stored energy
  • Unsecured site
  • Slips and trips
  • Plant collision
  • Incomplete records

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Work Health and Safety Act 2011 (or corresponding state/territory WHS Act): primary duty of care, consultation and worker duties.
  • Work Health and Safety Regulations: regs 34-39 (risk management, consultation, information, training and supervision); regs 54-55 (falling objects); regs 78-80 (falls and rescue); regs 81 and 85 with Schedule 3 (high risk work licensing); regs 201, 204, 206 and 237 (plant installation, dismantling, use and records); regs 297 and 299 (high risk construction work and SWMS).
  • Model Code of Practice: Tower Cranes, 2023, including planning, inspections, dismantling, crane stability, falling objects, access and emergency arrangements.
  • Model Code of Practice: Managing the Risks of Plant in the Workplace, November 2024, including tower crane design and item registration requirements.
  • AS 1418.1 Cranes, hoists and winches—General requirements; AS 1418.4 Tower cranes; AS 2550.1 Safe use—General requirements; AS 2550.4 Safe use—Tower cranes; AS 1891.4 Selection, use and maintenance of industrial fall-arrest systems; AS 1353.2 Flat synthetic-webbing slings—Care and use.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionCivil Construction and EarthworksMining and Resources

Related templates

$79.50

$96.80

Save $17.30

One-time payment