This risk assessment covers tower crane assembly and dismantling activities, including planning, access, lifting, stability, environmental conditions and emergency arrangements.

Activities covered include

  • Plan the dismantling work, consult relevant parties and review the work area
  • Access and work safely at height on crane structures
  • Coordinate communications, emergency response and plant security

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Tower Crane Assembly - Dismantling Risk Assessment
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This risk assessment covers tower crane assembly and dismantling activities, including planning, access, lifting, stability, environmental conditions and emergency arrangements. It supports work planning by identifying hazards and considering controls for dismantling activities and changing site conditions.

Activities & Risks Covered

This assessment addresses activities and risks including:

  • Plan the dismantling work, consult relevant parties and review the work area
  • Confirm worker competency, required licences and supervision arrangements
  • Inspect delivered crane components, fittings and plant condition before work
  • Set exclusion zones and manage interfaces with traffic, plant, pedestrians and public areas
  • Identify electrical services and manage proximity and isolation risks
  • Access and work safely at height on crane structures
  • Lift, lower, rig and manage suspended crane components
  • Maintain stability throughout the progressive dismantling sequence
  • Monitor weather, visibility and changing environmental conditions
  • Coordinate communications, emergency response and plant security

Who is this for?

Suitable for contractors, workers, supervisors and businesses involved in tower crane assembly or dismantling activities.

Activities & Hazards Covered

Activity Potential Hazards
Planning, consultation and work area review
  • Unidentified site hazards affecting dismantling sequence
  • Crane collapse due to unsuitable dismantling method or poor stability planning
  • Interaction with nearby structures, plant, pedestrians or public areas
  • Inadequate consultation between crane crew, principal contractor and other duty holders
Competency, licences and supervision
  • Unlicensed or inexperienced workers carrying out high risk work
  • Incorrect slinging, signalling or dismantling decisions
  • Poor coordination leading to collision, dropped components or uncontrolled movement
Delivery, component inspection and plant condition
  • Failure of bolts, pins, ropes, sheaves, brakes or structural components
  • Use of damaged, incompatible or wrongly identified crane sections or fittings
  • Mechanical failure during dismantling causing collapse or dropped objects
Establishing exclusion zones and traffic interfaces
  • Workers or public struck by falling components, tools or suspended items
  • Collision with mobile plant, delivery vehicles or site traffic
  • Unauthorised access into the dismantling area
Electrical isolation and proximity to services
  • Electrocution or arc flash from overhead electric lines
  • Contact with underground services during plant setup or support works
  • Fire, cable whip or energised metalwork following electrical contact
Working at height and access on the crane
  • Falls from ladders, platforms, jib, mast or access points
  • Dropped tools or materials from height
  • Fatigue or loss of footing while moving on the structure
Dismantling lifts, rigging and suspended components
  • Dropped crane components during lifting or lowering
  • Load swing, uncontrolled movement or snagging
  • Failure of slings, shackles or lifting points
  • Workers struck by suspended or shifting components
Stability during progressive dismantling
  • Crane instability as sections, jib components, ties or counterweights are removed
  • Collapse from incorrect sequence or premature removal of stabilising elements
  • Failure of temporary support arrangements
Weather, visibility and environmental conditions
  • Wind causing suspended sections or crane components to become uncontrollable
  • Lightning, rain, heat or dust reducing safety and communication
  • Slips, loss of grip or poor visibility affecting workers at height and plant operators
Communication, emergency response and securing plant
  • Miscommunication during critical movements
  • Delayed response to injury, plant malfunction or rescue from height
  • Unauthorised operation or unsafe condition when plant is left unattended

Need to tailor this risk assessment?

Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:

  • Model guidance: Model Code of Practice: Managing risks of plant in the workplace — Plant used to lift or suspend persons or things; p. 17.
  • Model guidance: Model Code of Practice: Construction work — 6.2 Workplace specific induction training; p. 41.
  • Model guidance: Model Code of Practice: Managing electrical risks in the workplace — 2.1 Identifying the hazards; p. 14.
  • Model guidance: Model Code of Practice: First aid in the workplace — 3. First aid equipment, facilities and training; p. 12.
  • Model guidance: Model Code of Practice: Managing the risk of fatigue at work — Provide sufficient breaks while at work; p. 30.
  • Model guidance: Model Code of Practice: Managing the risk of falls at workplaces — 3.2 Identifying the hazards; p. 16.
  • Model guidance: Model Code of Practice: Managing the work environment and facilities — 2.8 Heat and cold; p. 21.
  • Model guidance: Model Code of Practice: Excavation work — 2.3. Controlling the risks; p. 17.
  • Model guidance: Model Code of Practice: How to manage work health and safety risks — 5. Step 4 — How to review controls; p. 27.

Standard Risk Assessment Features (Click to Expand)
  • Activity-specific hazard identification and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each activity
  • Risk matrix and assessment classification
  • Review, monitoring and sign-off fields
  • Site-specific customisation before use

Suitable for Industries

Building and ConstructionCivil Construction and EarthworksMining and Resources