BlueSafe

Tow Truck Tilt Tray Operations and Vehicle Recovery SWMS

This SWMS covers tow truck tilt tray operations and vehicle recovery, from scene assessment through loading, transport, unloading and equipment close-out.

Activities covered include

  • Assess the recovery scene and plan the method
  • Connect recovery equipment
  • Maintain recovery equipment and complete close-out

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Tow Truck Tilt Tray Operations and Vehicle Recovery SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers tow truck tilt tray operations and vehicle recovery, from scene assessment through loading, transport, unloading and equipment close-out. It supports work planning and risk management by addressing traffic, vehicle movement, hydraulic systems, recovery equipment and load restraint hazards.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Assess the recovery scene and plan the method
  • Travel to the recovery location
  • Establish traffic and site controls
  • Position and check the tow truck
  • Inspect the vehicle being recovered
  • Deploy the tilt tray and operating controls
  • Connect recovery equipment
  • Winch the vehicle onto the tray
  • Use wheel-lift or other recovery methods where required
  • Restrain and transport the loaded vehicle
  • Unload, hand over and securely store vehicles
  • Maintain recovery equipment and complete close-out

Who is this for?

For contractors, workers, supervisors and businesses carrying out tow truck, tilt tray and vehicle recovery activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan recovery and assess scene
  • Uncontrolled traffic
  • Unstable casualty vehicle
  • Fuel or fluid release
  • Aggressive occupants
  • Incorrect recovery method
Travel to recovery location
  • Road collision
  • Driver fatigue
  • Vehicle breakdown
  • Loose recovery equipment
  • Distraction while driving
Establish traffic and site controls
  • Passing vehicle strike
  • Pedestrian entry
  • Poor visibility
  • Reversing collision
  • Uneven work surface
Position tow truck and pre-start
  • Tow truck roll-over
  • Plant collision
  • Hydraulic failure
  • Unexpected tray movement
  • Crush points
Inspect casualty vehicle condition
  • Unintended vehicle movement
  • Fire or electrical energy
  • Fuel leakage
  • Sharp damaged panels
  • Airbag deployment
Deploy tilt tray and controls
  • Crush from moving tray
  • Tray uncontrolled descent
  • Slip on tray surface
  • Hydraulic hose failure
  • Worker struck by tray
Connect recovery equipment
  • Winch-line failure
  • Crush from vehicle movement
  • Incorrect recovery point
  • Manual handling strain
  • Entanglement in cable
Winch vehicle onto tray
  • Runaway vehicle
  • Winch-line recoil
  • Crush between vehicles
  • Vehicle roll-off
  • Tyre or steering failure
Use wheel lift or specialist methods
  • Wheel-lift detachment
  • Driveline damage
  • Scooter instability
  • Heavy vehicle overload
  • Suspended load crush
Restrain loaded vehicle
  • Vehicle movement in transit
  • Strap failure
  • Crush during restraint
  • Load overhang
  • Unsecured loose items
Transport to destination
  • Road collision
  • Load shift
  • Bridge or height strike
  • Driver fatigue
  • Tyre failure
Unload and hand over vehicle
  • Vehicle roll-away
  • Crush from tray movement
  • Unauthorised access
  • Property damage
  • Pedestrian strike
Store vehicles and secure yard
  • Unauthorised vehicle access
  • Vehicle fire
  • Fluid contamination
  • Vehicle collision
  • Slip and trip hazards
Maintain equipment and close out
  • Unexpected plant start
  • Hydraulic injection injury
  • Stored energy
  • Manual handling strain
  • Defective recovery gear reuse

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Work Health and Safety Act 2011 (or corresponding state or territory WHS Act), ss 19, 27, 28 and 46-49: primary duty of care, officer due diligence, worker duties and consultation.
  • Work Health and Safety Regulations 2011 (or corresponding state or territory regulations), Part 3.1 rr 32-38: identify hazards, manage risks, maintain controls and review controls.
  • Work Health and Safety Regulations 2011 (or corresponding state or territory regulations), rr 44-47: personal protective equipment.
  • Work Health and Safety Regulations 2011 (or corresponding state or territory regulations), rr 60-61: hazardous manual tasks.
  • Work Health and Safety Regulations 2011 (or corresponding state or territory regulations), rr 203-210: management, inspection, maintenance, proper use, isolation and guarding of plant.
  • Work Health and Safety Regulations 2011 (or corresponding state or territory regulations), rr 291 and 299: high-risk construction work and SWMS requirements where recovery work forms part of construction work.
  • Code of Practice: Managing the Risks of Plant in the Workplace (2024): plant inspection, operator training, maintenance, isolation and prevention of unauthorised use.
  • Code of Practice: Moving Plant on Construction Sites: separation of pedestrians and plant, vehicle-management planning, reversing controls and SWMS requirements in moving-plant areas.
  • Code of Practice: Hazardous Manual Tasks: eliminate or minimise musculoskeletal risks from handling chains, straps, wheel dollies and recovery equipment.
  • National Heavy Vehicle Regulator, Load Restraint Guide: secure loads to prevent movement during transport.
  • Applicable state or territory Road Rules, Heavy Vehicle National Law, tow-truck legislation and road authority traffic-control requirements.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Transport and LogisticsAutomotive and Mechanical

Related templates

$79.50

$96.80

Save $17.30

One-time payment