Plumbing Drainage SWMS
This SWMS covers plumbing drainage work, including planning, service location, trench excavation, pipe installation, connections, testing, reinstatement and demobilisation.
Activities covered include
- Review plans and scope the work
- Install drainage pipework
- Clean up and demobilise
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers plumbing drainage work, including planning, service location, trench excavation, pipe installation, connections, testing, reinstatement and demobilisation. It supports work planning and risk management for underground services, trenching, plant, sewage, dust, pressure, manual-handling and public-access hazards.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Review plans and scope the work
- Establish the work area
- Locate and expose existing services
- Position plant and materials
- Excavate the drainage trench
- Prepare bedding and the trench base
- Install drainage pipework
- Connect to existing drainage
- Test the drainage system
- Backfill and compact
- Reinstate surfaces
- Clean up and demobilise
Who is this for?
For contractors, workers, supervisors and businesses carrying out plumbing drainage work.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Review plans and scope |
|
| Establish work area |
|
| Locate and expose services |
|
| Position plant and materials |
|
| Excavate drainage trench |
|
| Prepare bedding and base |
|
| Install drainage pipework |
|
| Connect to existing drainage |
|
| Test drainage system |
|
| Backfill and compact |
|
| Reinstate surfaces |
|
| Clean up and demobilise |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Applicable plumbing, drainage, building, environmental protection, road-use and utility-owner requirements in the jurisdiction of work.
- Model Code of Practice: Construction work (guidance only; confirm jurisdictional adoption).
- Model Code of Practice: Excavation work (guidance only; confirm jurisdictional adoption). Excavation connected with a trench deeper than 1.5 m is identified as high risk construction work requiring a SWMS.
- Model Code of Practice: Managing risks of plant in the workplace (guidance only; confirm jurisdictional adoption).
- Model Code of Practice: Managing electrical risks in the workplace and Work near overhead and underground electric lines (guidance only; confirm jurisdictional adoption).
- Model Code of Practice: Confined spaces; Hazardous manual tasks; Managing risks of hazardous chemicals in the workplace; and Managing the work environment and facilities (guidance only; confirm jurisdictional adoption).
- AS/NZS 3500.2 Plumbing and drainage—Sanitary plumbing and drainage.
- AS/NZS 1260 PVC-U pipes and fittings for drain, waste and vent application.
- AS 4744.1 Steel shoring and trench lining—Design.
- AS/NZS 1576 Scaffolding and AS 1657 Fixed platforms, walkways, stairways and ladders where access systems are used.
- AS/NZS 3012 Electrical installations—Construction and demolition sites.
- AS/NZS 3760 In-service safety inspection and testing of electrical equipment.
- AS 2865 Confined spaces where confined-space entry is authorised.
- AS 2550 series Cranes, hoists and winches—Safe use, where lifting plant is used.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
One-time payment