Civil Drainage Dewatering and Water Infrastructure SWMS
This SWMS covers civil drainage dewatering and water infrastructure work, from planning and site setup through excavation, installation, testing and handover.
Activities covered include
- Plan work sequencing, service conflicts and emergency response
- Install dewatering systems, pumps, hoses and discharge controls
- Test, commission, backfill, reinstate and hand over the work
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers civil drainage dewatering and water infrastructure work, from planning and site setup through excavation, installation, testing and handover. It supports planning and risk management for ground conditions, water, services, plant, trenches, pipes and discharge.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan work sequencing, service conflicts and emergency response
- Set up the site and isolate affected services
- Position plant and complete pre-start checks
- Excavate, support trenches and manage spoil
- Install dewatering systems, pumps, hoses and discharge controls
- Lay pipes and culverts, and construct pits and hydraulic structures
- Carry out river diversion and waterway work
- Complete sewer and utility connections
- Test, commission, backfill, reinstate and hand over the work
Who is this for?
For contractors, workers, supervisors and businesses carrying out civil drainage, dewatering and water infrastructure activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Planning and work sequencing |
|
| Site setup and service isolation |
|
| Plant positioning and pre-starts |
|
| Excavation and trench support |
|
| Installing dewatering systems |
|
| Managing slurry and discharge |
|
| Laying pipes and culverts |
|
| Constructing pits and hydraulic structures |
|
| River diversion and waterway works |
|
| Sewer and utility connections |
|
| Testing and commissioning |
|
| Backfill and reinstatement |
|
| Demobilisation and handover |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: Construction Work.
- Model Code of Practice: Excavation Work. The Code identifies dewatering, groundwater, contaminated water, water in-rush and ground collapse as excavation hazards.
- Model Code of Practice: Confined Spaces.
- Model Code of Practice: Managing the Risks of Plant in the Workplace. It addresses the risk-management process, plant maintenance and the interaction of people with mobile plant.
- Model Code of Practice: Managing the Risk of Falls at Workplaces.
- Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace.
- Model Code of Practice: Managing Noise and Preventing Hearing Loss at Work.
- Model Code of Practice: How to Manage Work Health and Safety Risks.
- AS 2865 Confined spaces; AS 4744.1 Steel shoring and trench lining equipment; AS/NZS 3012 Electrical installations—construction and demolition sites; AS 2550 series Cranes, hoists and winches; AS 4991 Lifting devices; AS 1742.3 Traffic control devices for works on roads; AS/NZS 1715 and AS/NZS 1716 Respiratory protective equipment; AS/NZS 1337.1 Eye and face protection; AS/NZS 2210.3 Safety footwear; AS/NZS 4602.1 High-visibility safety garments; AS/NZS 1270 Hearing protectors; AS/NZS 1801 Occupational protective helmets.
- Model WHS laws and model Codes of Practice are guidance unless adopted or otherwise given legal effect in the applicable jurisdiction. Confirm local regulator, road authority, environmental authority and asset-owner requirements before work starts. The Construction Work Code requires PCBUs to consult, cooperate and coordinate overlapping contractor activities.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment