BlueSafe

Civil Drainage Dewatering and Water Infrastructure SWMS

This SWMS covers civil drainage dewatering and water infrastructure work, from planning and site setup through excavation, installation, testing and handover.

Activities covered include

  • Plan work sequencing, service conflicts and emergency response
  • Install dewatering systems, pumps, hoses and discharge controls
  • Test, commission, backfill, reinstate and hand over the work

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Civil Drainage Dewatering and Water Infrastructure SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers civil drainage dewatering and water infrastructure work, from planning and site setup through excavation, installation, testing and handover. It supports planning and risk management for ground conditions, water, services, plant, trenches, pipes and discharge.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan work sequencing, service conflicts and emergency response
  • Set up the site and isolate affected services
  • Position plant and complete pre-start checks
  • Excavate, support trenches and manage spoil
  • Install dewatering systems, pumps, hoses and discharge controls
  • Lay pipes and culverts, and construct pits and hydraulic structures
  • Carry out river diversion and waterway work
  • Complete sewer and utility connections
  • Test, commission, backfill, reinstate and hand over the work

Who is this for?

For contractors, workers, supervisors and businesses carrying out civil drainage, dewatering and water infrastructure activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Planning and work sequencing
  • Unplanned service conflict
  • Unstable ground design
  • Water in-rush
  • Conflicting contractor activities
  • Inadequate emergency response
Site setup and service isolation
  • Underground services strike
  • Overhead electrical contact
  • Public vehicle intrusion
  • Unauthorised entry
  • Adjacent traffic
Plant positioning and pre-starts
  • Plant roll-over
  • Plant-person collision
  • Swinging counterweight
  • Hydraulic failure
  • Electrical lead damage
Excavation and trench support
  • Ground collapse
  • Worker burial
  • Fall into excavation
  • Falling spoil
  • Underground service damage
  • Water ingress
Installing dewatering systems
  • Water in-rush
  • Trench collapse
  • Electrical shock
  • Hose whip
  • Pump failure
  • Contaminated water exposure
Managing slurry and discharge
  • Chemical splash
  • Slurry engulfment
  • Contaminated water
  • Sediment release
  • Hose rupture
  • Slips on wet surfaces
Laying pipes and culverts
  • Crush from suspended load
  • Pipe roll-over
  • Trench collapse
  • Pinch points
  • Manual handling strain
  • Silica dust
Constructing pits and hydraulic structures
  • Fall into pit
  • Confined atmosphere
  • Precast collapse
  • Concrete burns
  • Reinforcement impalement
  • Waterway exposure
River diversion and waterway works
  • Drowning
  • Rapid flow
  • Bank collapse
  • Plant entering water
  • Flooding
  • Environmental contamination
Sewer and utility connections
  • Sewer gases
  • Biological exposure
  • Energised services
  • Gas release
  • Pressurised water release
  • Confined space entry
Testing and commissioning
  • Pressurised line failure
  • Test plug ejection
  • Electrical shock
  • Water release
  • Manual handling strain
Backfill and reinstatement
  • Plant strike
  • Trench collapse
  • Pipe damage
  • Dust exposure
  • Compactor vibration
  • Uneven surfaces
Demobilisation and handover
  • Residual excavation hazards
  • Uncontrolled water discharge
  • Plant loading incident
  • Sharp waste
  • Unauthorised access

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model Code of Practice: Construction Work.
  • Model Code of Practice: Excavation Work. The Code identifies dewatering, groundwater, contaminated water, water in-rush and ground collapse as excavation hazards.
  • Model Code of Practice: Confined Spaces.
  • Model Code of Practice: Managing the Risks of Plant in the Workplace. It addresses the risk-management process, plant maintenance and the interaction of people with mobile plant.
  • Model Code of Practice: Managing the Risk of Falls at Workplaces.
  • Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace.
  • Model Code of Practice: Managing Noise and Preventing Hearing Loss at Work.
  • Model Code of Practice: How to Manage Work Health and Safety Risks.
  • AS 2865 Confined spaces; AS 4744.1 Steel shoring and trench lining equipment; AS/NZS 3012 Electrical installations—construction and demolition sites; AS 2550 series Cranes, hoists and winches; AS 4991 Lifting devices; AS 1742.3 Traffic control devices for works on roads; AS/NZS 1715 and AS/NZS 1716 Respiratory protective equipment; AS/NZS 1337.1 Eye and face protection; AS/NZS 2210.3 Safety footwear; AS/NZS 4602.1 High-visibility safety garments; AS/NZS 1270 Hearing protectors; AS/NZS 1801 Occupational protective helmets.
  • Model WHS laws and model Codes of Practice are guidance unless adopted or otherwise given legal effect in the applicable jurisdiction. Confirm local regulator, road authority, environmental authority and asset-owner requirements before work starts. The Construction Work Code requires PCBUs to consult, cooperate and coordinate overlapping contractor activities.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionFarming and AgricultureCivil Construction and EarthworksMining and ResourcesPlumbing and Gasfitting

Related templates

$79.50

$96.80

Save $17.30

One-time payment