Plumbing Drainage and Gas Fitting SWMS
This SWMS covers plumbing drainage and gas fitting work, from planning and service location through to installation, testing, reinstatement and sign-off.
Activities covered include
- Plan the work and establish the work area
- Install drainage pipework
- Connect and test drainage, backfill and complete sign-off
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers plumbing drainage and gas fitting work, from planning and service location through to installation, testing, reinstatement and sign-off. It supports planning excavations, pipework and testing activities while managing gas, service, trench, contamination and material-handling hazards.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the work and establish the work area
- Locate and isolate existing services
- Excavate and support trenches
- Enter pits and chambers where required
- Unload and handle pipes and materials
- Install drainage pipework
- Cut materials and penetrate structures
- Install gas pipework
- Pressure test and purge gas pipework
- Connect and test drainage, backfill and complete sign-off
Who is this for?
For contractors, workers, supervisors and businesses carrying out plumbing drainage and gas fitting work.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Pre-start planning |
|
| Establish work area |
|
| Locate and isolate services |
|
| Excavate and support trench |
|
| Enter pits and chambers |
|
| Unload and handle materials |
|
| Install drainage pipework |
|
| Cut and penetrate structures |
|
| Install gas pipework |
|
| Pressure test and purge gas |
|
| Connect and test drainage |
|
| Backfill and reinstate |
|
| Clean up and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Applicable plumbing, drainage, gasfitting, building, electrical safety, dangerous-goods and environmental legislation, licensing rules and regulator requirements in the jurisdiction where the work is performed.
- Model Code of Practice: Construction work, as adopted or applied in the relevant jurisdiction; model codes are guidance and do not automatically have legal effect in every jurisdiction.
- Model Code of Practice: Excavation work, as adopted or applied locally; it identifies support, benching or battering and protection from unauthorised entry for trenches at least 1.5 m deep.
- Model Code of Practice: Confined spaces, as adopted or applied locally; sewer-related spaces may present biological, atmospheric, electrical and mechanical hazards.
- Model Codes of Practice: Managing electrical risks in the workplace; Managing risks of hazardous chemicals in the workplace; Managing the risks of plant in the workplace; Hazardous manual tasks; Managing the work environment and facilities; and Managing the risk of falls at workplaces, as adopted or applied locally.
- AS/NZS 3500 series Plumbing and drainage; AS/NZS 5601 series Gas installations; AS/NZS 1596 Storage and handling of LP Gas; AS 2865 Confined spaces; AS/NZS 3012 Electrical installations—Construction and demolition sites; AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment; AS/NZS 2210.3 Safety footwear; AS/NZS 1337.1 Eye and face protection; AS/NZS 1270 Hearing protectors; AS/NZS 4602.1 High visibility safety garments.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment