This risk assessment covers manual excavation and hand digging, from planning and service locating through to close-out.

Activities covered include

  • Planning excavation work, confirming permits and locating underground services
  • Using hand tools and manually moving spoil while managing fatigue and injury risks
  • Preparing emergency communication, stop-work responses and site close-out arrangements

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Manual Excavation and Hand Digging Risk Assessment
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This risk assessment covers manual excavation and hand digging, from planning and service locating through to close-out. It supports identifying changing ground, service, access and emergency risks before and during digging work.

Activities & Risks Covered

This assessment addresses activities and risks including:

  • Planning excavation work, confirming permits and locating underground services
  • Inspecting and setting up the dig area, edges, spoil areas and access controls
  • Hand digging near underground electricity, gas, water, sewer and communications services
  • Managing excavation depth, ground stability, collapse and entry risks
  • Providing safe access, egress and controls around excavation edges
  • Using hand tools and manually moving spoil while managing fatigue and injury risks
  • Managing spoil placement, materials, adjacent plant, traffic and congestion
  • Monitoring water ingress, hazardous atmospheres and contaminated ground
  • Protecting adjacent structures, services and surrounding assets from soil movement
  • Preparing emergency communication, stop-work responses and site close-out arrangements

Who is this for?

For contractors, workers, supervisors and businesses carrying out manual excavation and hand digging.

Activities & Hazards Covered

Activity Potential Hazards
Planning, permits and service locating
  • Striking underground electricity, gas, water, sewer or communications services
  • Wrong assumptions based on outdated plans
  • Unauthorised start without current service information
  • Excavation in adjacent service corridors affecting third parties
Site inspection and set-up
  • Unidentified ground conditions
  • Public or worker entry into the dig area
  • Slip, trip and uneven surface hazards
  • Poor visibility of excavation edges and spoil areas
Manual digging near underground services
  • Electric shock, arc flash or burns from buried electrical cables
  • Gas release, fire or explosion
  • Flooding, contamination or service interruption from damaged pipes
  • Tool contact with fragile or shallow-buried services
Excavation depth, ground stability and collapse
  • Trench wall collapse or ground sloughing
  • Engulfment or entrapment
  • Undermining adjacent surfaces or structures
  • Workers entering unstable excavations
Access, egress and work around excavation edges
  • Falls into the excavation
  • Difficulty exiting during an emergency
  • Slips while entering or leaving the work area
  • People stepping too close to unsupported edges
Manual handling and use of hand tools
  • Musculoskeletal strain from digging, lifting and moving spoil
  • Struck-by injuries from picks, crowbars and shovels used in close proximity
  • Blisters, cuts and hand injuries
  • Fatigue from repetitive or awkward postures
Spoil, materials and adjacent plant or traffic
  • Spoil falling back into the excavation
  • Vehicle or plant movement affecting ground stability
  • Workers struck by mobile plant or passing traffic
  • Restricted space causing congestion around the dig
Water, atmosphere and contaminated ground
  • Water ingress causing slips, collapse or engulfment
  • Hazardous atmosphere including low oxygen, flammable gas or contaminants
  • Exposure to sewage, contaminated soil, dust or biological hazards
  • Reduced visibility and footing in wet conditions
Adjacent structures, services and surrounding assets
  • Undermining footings, retaining walls, pavements or nearby structures
  • Damage from vibration or soil movement
  • Water penetration affecting nearby property
  • Unexpected ground failure around existing assets
Emergency response, communication and close-out
  • Delayed response to collapse, service strike or medical event
  • Workers not knowing stop-work triggers
  • Unauthorised access after the shift
  • Controls not maintained as conditions change

Need to tailor this risk assessment?

Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:

  • Model guidance: Model Code of Practice: Excavation work — 2.3. Controlling the risks; p. 17.
  • Model guidance: Model Code of Practice: Hazardous manual tasks — 4.1 The hierarchy of control measures; p. 31.
  • Model guidance: Model Code of Practice: Managing risks of plant in the workplace — Plant hazard identification — Traffic movements in the workplace; p. 17.
  • Model guidance: Model Code of Practice: Managing the risk of falls at workplaces — 3.2 Identifying the hazards; p. 16.
  • Model guidance: Model Code of Practice: Managing the work environment and facilities — 2. The work environment; p. 13.
  • Model guidance: Model Code of Practice: Managing the risk of fatigue at work — Provide sufficient breaks while at work; p. 30.
  • Model guidance: Model Code of Practice: How to manage work health and safety risks — 5. Step 4 — How to review controls; p. 27.
  • Model guidance: Model Code of Practice: Construction work — 6.2 Workplace specific induction training; p. 41.
  • Model guidance: Model Code of Practice: First aid in the workplace — 3. First aid equipment, facilities and training; p. 12.

Standard Risk Assessment Features (Click to Expand)
  • Activity-specific hazard identification and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each activity
  • Risk matrix and assessment classification
  • Review, monitoring and sign-off fields
  • Site-specific customisation before use

Suitable for Industries