Quarry Excavation and Screen Plant Operations Risk Assessment
This risk assessment covers quarry excavation and screen plant operations, including plant movement, material handling, maintenance and abnormal events.
Activities covered include
- Plan site layout, ground conditions, services, access and emergency egress
- Manage maintenance, cleaning, isolation and blockage clearing
- Prepare for fire, injury, plant jams and other abnormal events
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This risk assessment covers quarry excavation and screen plant operations, including plant movement, material handling, maintenance and abnormal events. It supports planning for site conditions, identifying operational hazards and managing risks before and during work.
Activities & Risks Covered
This assessment addresses activities and risks including:
- Plan site layout, ground conditions, services, access and emergency egress
- Complete start-up and pre-operational plant checks
- Manage excavation faces, edges, falling material and exclusion areas
- Control mobile plant, traffic, reversing and operating-area access
- Operate feeding, screening and conveying equipment with moving parts in mind
- Manage maintenance, cleaning, isolation and blockage clearing
- Control dust, silica and reduced visibility from airborne material
- Address noise, vibration, fatigue and communication challenges
- Maintain safe access, housekeeping and emergency escape around plant
- Prepare for fire, injury, plant jams and other abnormal events
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out quarry excavation and screen plant operations.
Activities & Hazards Covered
| Activity | Potential Hazards |
|---|---|
| Site planning, ground conditions and services |
|
| Arrival, start-up and pre-operational checks |
|
| Excavation and face work |
|
| Mobile plant movement and traffic interaction |
|
| Feeding, screening and conveying operations |
|
| Maintenance, cleaning, isolation and blockages |
|
| Dust, silica and air quality |
|
| Noise, vibration and operator fatigue |
|
| Work at height, access and housekeeping around plant |
|
| Emergencies, fire and abnormal events |
|
Need to tailor this risk assessment?
Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:
- Model guidance: Model Code of Practice: Managing risks of plant in the workplace — Plant hazard identification — Traffic movements in the workplace; p. 17.
- Model guidance: Model Code of Practice: Excavation work — 2.3. Controlling the risks; p. 17.
- Model guidance: Model Code of Practice: Managing the work environment and facilities — 2. The work environment; p. 13.
- Model guidance: Model Code of Practice: Managing the risk of fatigue at work — Provide sufficient breaks while at work; p. 30.
- Model guidance: Model Code of Practice: Managing the risk of falls at workplaces — 3.2 Identifying the hazards; p. 16.
- Model guidance: Model Code of Practice: First aid in the workplace — 3. First aid equipment, facilities and training; p. 12.
- Model guidance: Model Code of Practice: Construction work — 6.2 Workplace specific induction training; p. 41.
- Model guidance: Model Code of Practice: Managing noise and preventing hearing loss at work — 5. Controlling the risks; p. 29.
- Model guidance: Model Code of Practice: How to manage work health and safety risks — 5. Step 4 — How to review controls; p. 27.
Standard Risk Assessment Features (Click to Expand)
- Activity-specific hazard identification and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each activity
- Risk matrix and assessment classification
- Review, monitoring and sign-off fields
- Site-specific customisation before use
Suitable for Industries
Related templates
$79.50
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
One-time payment