
Excavator Use as Crane SWMS
- -100% Compliant with Australian WHS Acts & Regulations
- -Fully Editable MS Word & PDF Formats Included
- -Pre-filled Content - Ready to Deploy Immediately
- -Customisable - Easily Add Your Logo & Site Details
- -Includes 2 Years of Free Compliance Updates
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Product Overview
This SWMS covers using an excavator as a crane, including lift planning, inspections, work-area setup, load connection, lifting, placement and demobilisation. It supports work planning and risk management by addressing suspended loads, plant stability, lifting gear, ground conditions and electrical hazards.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the lifting task and assess the method
- Inspect the excavator and lifting gear
- Establish a controlled work area
- Check ground conditions and position the excavator
- Manage overhead electrical hazards
- Sling and connect the load
- Conduct the lift and control load movement
- Place and release the load safely
- Respond to abnormal events and emergencies
- Demobilise, secure equipment and manage residual hazards
Who is this for?
Suitable for contractors, workers, supervisors and businesses undertaking lifting work using an excavator as a crane.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan the lifting task |
|
| Inspect plant and lifting gear |
|
| Establish work area |
|
| Check ground and positioning |
|
| Manage electrical hazards |
|
| Sling and connect load |
|
| Conduct the lift |
|
| Place and release load |
|
| Respond to abnormal events |
|
| Demobilise and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, provide safe plant and systems of work, consult workers, and manage construction work.
- Model Code of Practice: How to manage work health and safety risks (November 2024) — guidance on identifying hazards, assessing risks, applying the hierarchy of controls and reviewing controls.
- Model Code of Practice: Managing risks of plant in the workplace — guidance for plant selection, inspection, maintenance, operator competency, isolation and exclusion zones.
- Model Code of Practice: Managing the risks of falls at workplaces — guidance where access to plant or elevated work presents a fall risk; refer to AS/NZS 1891 for fall-arrest systems.
- Model Code of Practice: Tower cranes (June 2023) — guidance on controlled lifting, suitable attachments, safe working limits, dogging and suspended-load exclusion zones.
- Model Code of Practice: Tunnels and shafts in construction — guidance that excavators should only lift where specifically designed and rated, with manufacturer lifting charts, level indication, appropriate safety devices and exclusion zones.
- AS 1418.8: Cranes, hoists and winches — Special purpose appliances; guidance for excavators specifically designed and rated for lifting.
- AS 2550 series: Cranes, hoists and winches — Safe use.
- AS 1418.1: Cranes, hoists and winches — General requirements.
- AS 4991: Lifting devices.
- AS 3775.2: Chain slings — Grade T — Care and use; AS 4497.2: Round slings — Synthetic fibre — Care and use; AS 1353.2: Flat synthetic-webbing slings — Care and use; AS 2759: Steel wire rope — Use, operation and maintenance.
- Electrical Safety Code of Practice: Working near overhead and underground electric lines — jurisdiction-specific guidance where adopted, including de-energisation, barriers, movement limiting devices and competent supervision.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
$79.50
$96.80