Mobile Crane SWMS
This SWMS covers mobile crane lifting work from lift planning and site setup through load handling, pack-down and handover.
Activities covered include
- Plan the lift operation and establish the work zone
- Lift, slew, land and release loads
- Complete handover, defect reporting and sign-off
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers mobile crane lifting work from lift planning and site setup through load handling, pack-down and handover. It supports planning and risk management by addressing ground, electrical, weather, crane movement, lifting gear and suspended-load hazards.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the lift operation and establish the work zone
- Assess ground conditions and manage electrical clearances
- Position and set up the crane
- Complete crane pre-start checks and inspect lifting gear
- Sling and secure loads
- Lift, slew, land and release loads
- Manage weather changes affecting lifting work
- Respond to crane, load and electrical emergencies
- Pack down the crane and control access
- Complete handover, defect reporting and sign-off
Who is this for?
Suitable for contractors, workers, supervisors and businesses involved in mobile crane lifting activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan lift operation |
|
| Establish work zone |
|
| Assess ground conditions |
|
| Manage electrical clearances |
|
| Position and set crane |
|
| Complete crane pre-start |
|
| Inspect lifting gear |
|
| Sling and secure load |
|
| Lift and slew load |
|
| Land and release load |
|
| Manage weather changes |
|
| Respond to emergencies |
|
| Pack down crane |
|
| Complete handover and sign-off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, consult workers, provide safe plant and systems of work, and ensure high risk construction work is undertaken in accordance with a SWMS.
- Safe Work Australia Model Code of Practice: Managing the Risks of Plant in the Workplace, as guidance only; confirm adoption and legal status in the relevant jurisdiction.
- Safe Work Australia Model Code of Practice: Construction Work, as guidance only; confirm adoption and legal status in the relevant jurisdiction.
- Mobile crane - Code of Practice 2024, as technical guidance for mobile crane planning, siting, operation, inspection and lift controls; verify jurisdictional applicability before use.
- Work near overhead and underground electric lines Code of Practice, as guidance for crane work near electrical assets; confirm applicable electrical safety laws and network operator requirements.
- AS 1418.5 Cranes, hoists and winches - Mobile cranes.
- AS 2550.5 Cranes, hoists and winches - Safe use - Mobile cranes.
- AS 1418.1 Cranes, hoists and winches - General requirements.
- AS 2550.1 Cranes, hoists and winches - Safe use - General requirements.
- AS 4991 Lifting devices.
- AS 3775 Chain slings for lifting purposes.
- AS/NZS 1891 series Industrial fall-arrest systems and devices, where work at height is required.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
One-time payment