This SWMS covers mobile crane lifting work from lift planning and site setup through load handling, pack-down and handover.

Activities covered include

  • Plan the lift operation and establish the work zone
  • Lift, slew, land and release loads
  • Complete handover, defect reporting and sign-off

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Mobile Crane SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers mobile crane lifting work from lift planning and site setup through load handling, pack-down and handover. It supports planning and risk management by addressing ground, electrical, weather, crane movement, lifting gear and suspended-load hazards.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan the lift operation and establish the work zone
  • Assess ground conditions and manage electrical clearances
  • Position and set up the crane
  • Complete crane pre-start checks and inspect lifting gear
  • Sling and secure loads
  • Lift, slew, land and release loads
  • Manage weather changes affecting lifting work
  • Respond to crane, load and electrical emergencies
  • Pack down the crane and control access
  • Complete handover, defect reporting and sign-off

Who is this for?

Suitable for contractors, workers, supervisors and businesses involved in mobile crane lifting activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan lift operation
  • Crane overload
  • Incorrect crane selection
  • Load collision
  • Uncontrolled load movement
  • Inadequate ground capacity
Establish work zone
  • Unauthorised entry
  • Vehicle collision
  • Pedestrian strike
  • Crush from counterweight
  • Falling load exposure
Assess ground conditions
  • Crane overturning
  • Outrigger sinkage
  • Underground service damage
  • Edge collapse
  • Uneven ground
Manage electrical clearances
  • Powerline contact
  • Electric shock
  • Arc flash
  • Crane energisation
  • Falling load
Position and set crane
  • Mobile plant collision
  • Crane roll-over
  • Crush from outriggers
  • Collision with structures
  • Reversing strike
Complete crane pre-start
  • Mechanical failure
  • Hydraulic failure
  • Safety device failure
  • Dropped load
  • Unplanned crane movement
Inspect lifting gear
  • Lifting gear failure
  • Dropped load
  • Sharp-edge sling damage
  • Incorrect WLL
  • Pinch points
Sling and secure load
  • Load imbalance
  • Crush injury
  • Dropped load
  • Sling slip
  • Sharp load edges
Lift and slew load
  • Crush from swinging load
  • Dropped load
  • Crane overload
  • Collision with structure
  • Loss of communication
Land and release load
  • Load collapse
  • Crush injury
  • Pinch points
  • Load roll
  • Premature sling release
Manage weather changes
  • Wind-driven load swing
  • Lightning strike
  • Reduced visibility
  • Slippery ground
  • Crane instability
Respond to emergencies
  • Crane instability
  • Powerline contact
  • Dropped load
  • Equipment failure
  • Serious injury
Pack down crane
  • Crush from outriggers
  • Plant collision
  • Falling equipment
  • Hydraulic failure
  • Unauthorised access
Complete handover and sign-off
  • Residual site hazards
  • Unreported plant defects
  • Unauthorised crane use
  • Slips and trips

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, consult workers, provide safe plant and systems of work, and ensure high risk construction work is undertaken in accordance with a SWMS.
  • Safe Work Australia Model Code of Practice: Managing the Risks of Plant in the Workplace, as guidance only; confirm adoption and legal status in the relevant jurisdiction.
  • Safe Work Australia Model Code of Practice: Construction Work, as guidance only; confirm adoption and legal status in the relevant jurisdiction.
  • Mobile crane - Code of Practice 2024, as technical guidance for mobile crane planning, siting, operation, inspection and lift controls; verify jurisdictional applicability before use.
  • Work near overhead and underground electric lines Code of Practice, as guidance for crane work near electrical assets; confirm applicable electrical safety laws and network operator requirements.
  • AS 1418.5 Cranes, hoists and winches - Mobile cranes.
  • AS 2550.5 Cranes, hoists and winches - Safe use - Mobile cranes.
  • AS 1418.1 Cranes, hoists and winches - General requirements.
  • AS 2550.1 Cranes, hoists and winches - Safe use - General requirements.
  • AS 4991 Lifting devices.
  • AS 3775 Chain slings for lifting purposes.
  • AS/NZS 1891 series Industrial fall-arrest systems and devices, where work at height is required.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections