Dogging Slinging and Rigging SWMS

This SWMS covers planning, preparing, directing and completing lifting activities involving dogging, slinging and rigging.

Activities covered include

  • Review the lift scope and establish the work zone
  • Conduct a test lift
  • Pack up equipment and sign off

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Dogging Slinging and Rigging SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers planning, preparing, directing and completing lifting activities involving dogging, slinging and rigging. It supports risk management by addressing work zones, lifting plant, lifting gear, load control, communication and pack-up.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review the lift scope and establish the work zone
  • Position lifting plant and assess ground conditions
  • Inspect lifting gear before use
  • Calculate and plan the lift
  • Prepare, sling and connect the load
  • Conduct a test lift
  • Direct crane movements and maintain communication
  • Lift and control the load
  • Land and disconnect the load
  • Pack up equipment and sign off

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out dogging, slinging and rigging activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review lift scope
  • Incorrect lift method
  • Unknown load weight
  • Unplanned work interface
  • Inadequate competence
Set up work zone
  • Unauthorised entry
  • Crush from swinging load
  • Vehicle collision
  • Overhead service contact
  • Poor ground conditions
Position lifting plant
  • Crane overturn
  • Outrigger failure
  • Plant collision
  • Crush from counterweight
  • Mechanical failure
Inspect lifting gear
  • Sling failure
  • Shackle failure
  • Dropped load
  • Hand injuries
  • Uncertified equipment
Calculate and plan lift
  • Overloading
  • Sling angle overload
  • Unbalanced load
  • Incorrect crane radius
  • Multiple-crane overload
Prepare and sling load
  • Load shift
  • Sling cut or abrasion
  • Load slip
  • Pinch points
  • Falling components
Connect lift chains
  • Chain disengagement
  • Incorrect shackle connection
  • Crush injury
  • Lifting-point failure
  • Falling load
Conduct test lift
  • Load imbalance
  • Rigging failure
  • Dropped load
  • Crush from load movement
  • Uncontrolled rotation
Direct crane movements
  • Incorrect hand signals
  • Communication failure
  • Crush from swinging load
  • Collision with structures
  • Operator distraction
Lift and control load
  • Working under raised loads
  • Swinging load
  • Load collision
  • Falling objects
  • Crane overload
  • Tag-line entanglement
Land and disconnect load
  • Crush at landing area
  • Load roll or collapse
  • Stored sling tension
  • Hand injuries
  • Premature disconnection
Pack up and sign off
  • Residual plant movement
  • Manual handling injury
  • Trip hazards
  • Damaged gear returned to service
  • Unauthorised area access

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, provide safe plant, prevent falling objects, and ensure lifting and suspending occur within the plant's safe working limits.
  • Model Code of Practice: Managing the Risks of Plant in the Workplace, as adopted or applied in the relevant jurisdiction.
  • Model Code of Practice: Managing the Risks of Construction Work, as adopted or applied in the relevant jurisdiction.
  • Model Code of Practice: Tower Cranes (2023), as guidance only; it identifies selection of slinging methods, lifting-gear inspection and out-of-view load direction as dogging work requiring a high risk work licence.
  • Model Code of Practice: Managing Risks in Stevedoring (2023), as guidance only; it requires load weight and safe working limits to be established, and supports licensed dogging where judgement is required or the load is out of the operator's view.
  • AS 1418 series Cranes, hoists and winches; AS 2550 series Cranes—Safe use; AS 4991 Lifting devices.
  • AS 2759 Steel wire rope—Use, operation and maintenance; AS 3775.2 Chain slings—Grade T—Care and use; AS 4497.2 Round slings—Synthetic fibre—Care and use; AS 1353.2 Flat synthetic-webbing slings—Care and use.
  • AS 2359 series Powered industrial trucks, where forklifts or forklift attachments are used.
  • AS/NZS 1891 series Industrial fall-arrest systems and devices, where fall-arrest equipment is used.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionCivil Construction and EarthworksMining and Resources