This risk assessment covers dogging, slinging and rigging activities, including lift planning, gear inspection, load control, communication and post-lift actions.

Activities covered include

  • Plan lifts and assess load characteristics, site conditions and simultaneous work
  • Sling, secure and balance loads before lifting
  • Respond to load shifts, gear failures, collisions and post-lift equipment checks

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Dogging Slinging and Rigging Risk Assessment
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This risk assessment covers dogging, slinging and rigging activities, including lift planning, gear inspection, load control, communication and post-lift actions. It supports planning by identifying hazards and control considerations for managing risks around lifting plant, suspended loads and work areas.

Activities & Risks Covered

This assessment addresses activities and risks including:

  • Plan lifts and assess load characteristics, site conditions and simultaneous work
  • Coordinate competent workers, supervision and crew roles
  • Inspect lifting gear, attachments and lifting points
  • Confirm lifting plant and attachments are suitable for the load and task
  • Set up the work area and manage exclusion zones
  • Sling, secure and balance loads before lifting
  • Communicate lift directions and stop commands
  • Move, slew, land and position suspended loads
  • Manage wind, rain, glare, poor light and overhead hazards
  • Respond to load shifts, gear failures, collisions and post-lift equipment checks

Who is this for?

Suitable for workers, supervisors, contractors and businesses involved in dogging, slinging or rigging activities.

Activities & Hazards Covered

Activity Potential Hazards
Planning and lift assessment
  • Incorrect lift planning for load shape, weight or centre of gravity
  • Using the wrong class of worker for dogging or rigging work
  • Unidentified site hazards such as nearby structures, overhead services, traffic or other plant
  • Multiple or simultaneous lifts increasing instability and coordination risks
Competency, supervision and crew coordination
  • Unlicensed or inexperienced workers making lifting decisions
  • Dogger distracted by other tasks
  • Poor crew numbers or unclear roles causing unsafe load control
  • Inadequate supervision for new or unfamiliar workers
Inspection of lifting gear and attachments
  • Failure of slings, chains, shackles, hooks or lifting points
  • Using damaged, worn, corroded or untagged gear
  • Incompatible lifting components or missing safety latches
  • Synthetic slings cut by sharp edges or unsuitable load contact
Plant suitability and operating limits
  • Overloading the crane or lifting plant
  • Using plant or attachments not designed for the load
  • Mechanical failure or instability during lifting
  • Poor visibility or plant limitations causing collision or uncontrolled movement
Work area setup and exclusion zones
  • Workers or the public entering the lifting area
  • People struck by a suspended load, falling object or moving plant
  • Loads travelling over persons, roadways or active work areas
  • Interaction with vehicles, pedestrians or adjacent trades
Slinging and securing the load
  • Load imbalance, slip or rollover from incorrect slinging
  • Incorrect sling angles reducing capacity
  • Loose items falling from the load
  • Hands and feet caught during connection or tensioning
Communication and directing the lift
  • Misunderstood signals between dogger and operator
  • Loss of communication due to noise, distance or obstructions
  • More than one person giving directions
  • Delayed stop command during an unsafe condition
Moving, slewing and landing the load
  • Uncontrolled swinging, spinning or sudden load movement
  • Collision with structures, scaffolds, services, other plant or stored materials
  • Load snagging during travel
  • Crush injuries while landing or positioning the load
Environmental conditions and overhead hazards
  • Wind affecting load control and crane stability
  • Rain, glare or poor light reducing visibility
  • Contact with overhead electric lines or other elevated services
  • Slips, trips and poor footing around the lift area
Emergency response, post-lift and PPE
  • Injury following dropped load, gear failure or collision
  • Workers exposed during unplanned load shift or plant fault
  • Cuts, foot injuries, eye injuries or minor impact injuries during normal handling
  • Unsafe gear left in service after the lift

Need to tailor this risk assessment?

Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:

  • Model guidance: Model Code of Practice: Managing risks of plant in the workplace — Plant used to lift or suspend persons or things; p. 17.
  • Model guidance: Model Code of Practice: Managing the risk of falls at workplaces — 3.2 Identifying the hazards; p. 16.
  • Model guidance: Model Code of Practice: First aid in the workplace — 3. First aid equipment, facilities and training; p. 12.
  • Model guidance: Model Code of Practice: Managing the work environment and facilities — 1.2 Managing risks associated with the work environment and facilities; p. 12.
  • Model guidance: Model Code of Practice: Managing the risk of fatigue at work — Provide sufficient breaks while at work; p. 30.
  • Model guidance: Model Code of Practice: How to manage work health and safety risks — 5. Step 4 — How to review controls; p. 27.

Standard Risk Assessment Features (Click to Expand)
  • Activity-specific hazard identification and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each activity
  • Risk matrix and assessment classification
  • Review, monitoring and sign-off fields
  • Site-specific customisation before use