
Rigging SWMS
- -100% Compliant with Australian WHS Acts & Regulations
- -Fully Editable MS Word & PDF Formats Included
- -Pre-filled Content - Ready to Deploy Immediately
- -Customisable - Easily Add Your Logo & Site Details
- -Includes 2 Years of Free Compliance Updates
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Product Overview
This SWMS covers planning, setting up and carrying out rigging work, from reviewing lift scope through to de-rigging and sign-off. It supports work planning and risk management for loads, lifting plant, rigging systems, access, stored energy and work-area controls.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Review the lift scope, rigging method and work requirements
- Establish and control the rigging work area
- Position lifting plant for the planned work
- Inspect rigging gear before use
- Assemble the required rigging system
- Attach and sling loads for lifting
- Hoist heavy components
- Install and secure lifted loads
- Tension cables and lines
- Carry out offshore rigging activities
- De-rig, manage residual hazards and complete sign-off
Who is this for?
Suitable for contractors, workers, supervisors and businesses involved in rigging activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Review lift scope |
|
| Establish work area |
|
| Position lifting plant |
|
| Inspect rigging gear |
|
| Assemble rigging system |
|
| Attach load and sling |
|
| Hoist heavy components |
|
| Install and secure load |
|
| Tension cables and lines |
|
| Conduct offshore rigging |
|
| De-rig and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, consult, provide information/training/supervision, manage plant, high risk work, falling objects and construction work.
- Model Code of Practice: Managing the Risks of Plant in the Workplace.
- Model Code of Practice: Construction Work.
- Model Code of Practice: Managing the Risk of Falls at Workplaces.
- Model Code of Practice: Tower Cranes. Model Codes are guidance and do not automatically have legal effect in every jurisdiction.
- Applicable regulator guidance for high risk work licensing, dogging, rigging, cranes, lifting plant and work near electrical lines.
- AS 1418 series Cranes, hoists and winches; AS 2550 series Cranes, hoists and winches—Safe use.
- AS 4991 Lifting devices; AS 3775.2 Chain slings—Grade T—Care and use; AS 2759 Steel wire rope—Use, operation and maintenance.
- AS 1666.1 Wire-rope slings—Product specification; AS 1353.2 Flat synthetic-webbing slings—Care and use; AS 4497.2 Round slings—Synthetic fibre—Care and use.
- AS/NZS 1891 series Industrial fall-arrest systems and devices; AS/NZS 5532 Manufacturing requirements for single-point anchor device use with harness systems.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
$79.50
$96.80