BlueSafe

Tunneling Safety SWMS

This SWMS covers tunnelling work from mobilisation and site setup through shaft entry, excavation, support, ventilation, emergency response, maintenance and demobilisation.

Activities covered include

  • Plan tunnel work and mobilise the site
  • Carry out micro-tunnelling and roadheader excavation activities
  • Respond to emergencies, maintain equipment, clean up and demobilise

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Tunneling Safety SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers tunnelling work from mobilisation and site setup through shaft entry, excavation, support, ventilation, emergency response, maintenance and demobilisation. It supports planning for ground conditions, underground services, plant, shafts, ventilation, materials handling and emergency risks.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan tunnel work and mobilise the site
  • Set up the site and isolate services
  • Position plant and complete pre-start checks
  • Manage shaft access and tunnel entry
  • Launch and operate tunnelling equipment
  • Carry out micro-tunnelling and roadheader excavation activities
  • Install tunnel support systems
  • Manage mucking, conveyors and materials handling
  • Monitor ventilation and environmental conditions
  • Respond to emergencies, maintain equipment, clean up and demobilise

Who is this for?

For contractors, workers, supervisors and businesses carrying out tunnelling work.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Planning and tunnel mobilisation
  • Unplanned ground conditions
  • Inadequate tunnel design
  • Unauthorised access
  • Conflicting work activities
  • Surface settlement
Site setup and services isolation
  • Underground services strike
  • Portal vehicle collision
  • Temporary electrical shock
  • Public entry
  • Falls into shaft
Plant positioning and pre-starts
  • Plant roll-over
  • Crush from moving plant
  • Hydraulic hose failure
  • Poor visibility
  • Diesel exhaust
Shaft access and entry
  • Fall into shaft
  • Falling objects
  • Hoist failure
  • Oxygen deficiency
  • Water inrush
  • Entrapment
TBM launch and operation
  • Cutterhead entanglement
  • Face blow-out
  • Segment crush
  • Conveyor entanglement
  • Pressurised slurry release
  • Fire and smoke
Micro-tunnelling procedures
  • Jacking frame crush
  • Pipe-jack failure
  • Slurry release
  • Launch shaft collapse
  • Unexpected ground loss
  • High-pressure hose rupture
Roadheader excavation
  • Rock fall
  • Cutterhead strike
  • Silica dust
  • Noise and vibration
  • Hydraulic fire
  • Plant-person interaction
Install tunnel support systems
  • Ground collapse
  • Rock bolt failure
  • Shotcrete rebound
  • Suspended mesh
  • Grout injection pressure
  • Work at height
Mucking and materials handling
  • Loader collision
  • Conveyor entanglement
  • Crush from segments
  • Falling loads
  • Manual handling strain
  • Spillage on walkways
Ventilation and environmental monitoring
  • Oxygen deficiency
  • Diesel particulate
  • Toxic gases
  • Silica dust
  • Heat stress
  • Poor visibility
Emergency response and evacuation
  • Tunnel fire
  • Flooding
  • Ground collapse
  • Loss of ventilation
  • Medical emergency
  • Communication failure
Maintenance and isolations
  • Unexpected start-up
  • Stored hydraulic energy
  • Electrical arc flash
  • Conveyor entanglement
  • Hot surfaces
  • Restricted access
Clean-up and demobilisation
  • Residual ground instability
  • Slips and trips
  • Plant collision
  • Chemical spill
  • Unsecured openings

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Work Health and Safety Act 2011 (Cth), ss 17–19, 46–49: primary duty of care, officer due diligence and consultation.
  • Work Health and Safety Regulations 2011 (Cth), rr 34–38: risk management; rr 291–299: construction work, high risk construction work and SWMS; r 295: designer safety report.
  • Work Health and Safety Regulations 2011 (Cth), Part 4.3: confined spaces; Part 4.4: falls; Part 4.5: high risk work; Part 4.7: plant and structures; Part 7.1: hazardous chemicals.
  • Excavation Work Code of Practice 2020: tunnelling design, ground support, ventilation, dewatering, plant interaction and shaft controls.
  • Tunnels and Shafts in Construction Code of Practice: TBM safety features, conventional tunnelling controls, ground-support requirements and Permit to Tunnel processes.
  • Managing Risks of Plant in the Workplace Code of Practice: inspection, maintenance, isolation and reinstatement of guards.
  • Managing Risks of Respirable Crystalline Silica in the Workplace Code of Practice: silica risk control plan and hierarchy of controls.
  • AS/NZS 1715 and AS/NZS 1716: respiratory protective equipment; AS/NZS 3012: electrical installations on construction sites; AS 1418 and AS 2550: cranes, hoists and lifting operations; AS 1674.1: hot-work fire precautions.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Civil Construction and EarthworksMining and Resources

Related templates

$79.50

$96.80

Save $17.30

One-time payment