BlueSafe

Traffic Control Setup Signage and Barricades SWMS

This SWMS covers the setup, monitoring and removal of traffic control signage, delineation, barricades, hoarding, lights and beacons.

Activities covered include

  • Review traffic management documents
  • Erect barricades and hoarding
  • Remove controls and complete the close-out inspection

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Traffic Control Setup Signage and Barricades SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers the setup, monitoring and removal of traffic control signage, delineation, barricades, hoarding, lights and beacons. It supports planning the layout, separating road users and managing hazards within an active work zone.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review traffic management documents
  • Inspect the site and approaching traffic conditions
  • Position the traffic control vehicle
  • Complete pre-start checks of traffic control equipment
  • Establish advance warning signs
  • Install tapers and delineation
  • Erect barricades and hoarding
  • Separate pedestrians, cyclists and vehicles
  • Install lights and beacons
  • Validate the traffic control layout
  • Monitor the active work zone
  • Remove controls and complete the close-out inspection

Who is this for?

Suitable for contractors, workers, supervisors and businesses setting up traffic control signage and barricades.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review traffic management documents
  • Incorrect traffic control layout
  • Vehicle impact
  • Pedestrian exposure
  • Unauthorised work
Inspect site and approaches
  • Limited sight distance
  • Overhead obstructions
  • Uneven ground
  • Unexpected traffic movements
  • Public access
Position traffic control vehicle
  • Reversing vehicle strike
  • Vehicle roll-away
  • Traffic collision
  • Plant-pedestrian interaction
Complete equipment pre-start
  • Defective warning devices
  • Manual handling strain
  • Falling equipment
  • Electrical battery failure
Establish advance warning signs
  • Worker struck by traffic
  • Traffic confusion
  • Sign blow-over
  • Driver distraction
Install tapers and delineation
  • Vehicle intrusion
  • Worker struck by traffic
  • Slips and trips
  • Unstable delineators
Erect barricades and hoarding
  • Barrier collapse
  • Crush injury
  • Public entry
  • Manual handling strain
  • Wind loading
Separate pedestrians and vehicles
  • Pedestrian struck by vehicle
  • Mobility access obstruction
  • Cyclist collision
  • Unauthorised site entry
Install lights and beacons
  • Poor night visibility
  • Electrical shock
  • Battery fire
  • Driver glare
  • Worker struck by traffic
Validate traffic control layout
  • Missing warning signs
  • Barrier gaps
  • Vehicle intrusion
  • Unauthorised access
  • Conflicting traffic movements
Monitor active work zone
  • Traffic control failure
  • Vehicle intrusion
  • Barrier displacement
  • Worker fatigue
  • Aggressive road users
Remove barriers and signage
  • Worker struck by traffic
  • Premature traffic release
  • Manual handling strain
  • Public access to hazards
Complete close-out inspection
  • Residual public hazards
  • Unsecured equipment
  • Incomplete records
  • Repeat incident

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Work Health and Safety Act 2011, ss 19, 28 and 29 — primary duty of care and worker duties.
  • Work Health and Safety Regulations 2011, rr 32–38 — identify hazards, apply the hierarchy of controls, maintain and review controls.
  • Work Health and Safety Regulations 2011, rr 297–299 — management of high risk construction work and SWMS requirements.
  • Model Code of Practice: Construction Work (2024) — traffic management, exclusion zones, trained traffic controllers and separation of pedestrians, plant and traffic.
  • Traffic Management for Construction or Maintenance Work Code of Practice — TMP/TGS planning, setup, operation, alteration and removal of traffic controls.
  • AS 1742.3 Manual of uniform traffic control devices — traffic control devices for works on roads; apply relevant state or territory road authority requirements.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Transport and LogisticsCivil Construction and EarthworksMining and Resources

Related templates

$79.50

$96.80

Save $17.30

One-time payment