BlueSafe

Traffic Control Setup Signage and Barricades Risk Assessment

This risk assessment covers setting up, monitoring and removing traffic control signage and barricades.

Activities covered include

  • Plan the setup and assess site conditions
  • Manually handle signs, frames and barricades
  • Pack up, remove controls and respond to emergencies

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Traffic Control Setup Signage and Barricades Risk Assessment
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This risk assessment covers setting up, monitoring and removing traffic control signage and barricades. It supports planning the layout, identifying hazards and managing risks around traffic, plant and public access.

Activities & Risks Covered

This assessment addresses activities and risks including:

  • Plan the setup and assess site conditions
  • Arrive, park and unload equipment
  • Set out advance warning signs
  • Install cones, barricades and exclusion zones
  • Work adjacent to live traffic and mobile plant
  • Manually handle signs, frames and barricades
  • Manage weather, visibility and environmental conditions
  • Manage public access and nearby movements
  • Monitor, inspect and adjust controls during the shift
  • Pack up, remove controls and respond to emergencies

Who is this for?

Suitable for contractors, workers, supervisors and businesses setting up traffic control signage and barricades.

Activities & Hazards Covered

Activity Potential Hazards
Pre-start planning and site assessment
  • Incorrect traffic control layout for the site conditions
  • Workers or the public exposed to live traffic due to poor planning
  • Conflicting vehicle, plant and pedestrian movements
  • Changes in site conditions not identified before setup starts
Arrival, parking and unloading
  • Workers struck by passing vehicles during arrival or unloading
  • Collision with mobile plant or site vehicles
  • Unsafe unloading position causing exposure to traffic
  • Falling or shifting equipment during unloading
Setting out advance warning signs
  • Workers struck by moving vehicles while placing signs
  • Poor sign visibility leading to late driver response
  • Incorrect sign spacing or sequence creating confusion
  • Slips, trips and falls on uneven shoulders or verges
Installing cones, barricades and exclusion zones
  • Workers entering live traffic lanes
  • Pedestrians entering the work area
  • Inadequate separation from plant, vehicles or the public
  • Barricades displaced by wind, traffic or uneven ground
Working adjacent to live traffic and mobile plant
  • Workers struck by road vehicles
  • Workers struck by reversing or turning plant
  • Vehicle intrusion into the work area
  • Driver distraction or non-compliance with temporary controls
Manual handling of signs, frames and barricades
  • Muscular strain from lifting or carrying awkward loads
  • Crush or pinch injuries to hands and feet
  • Fatigue from repetitive setup tasks
  • Dropped equipment causing injury
Weather, visibility and environmental conditions
  • Reduced visibility in rain, fog, dust or low light
  • Heat, UV exposure or dehydration
  • Wind blowing over signs or barricades
  • Slippery ground increasing slip risk
Public interface and access management
  • Pedestrians entering the work zone
  • Conflict with cyclists, deliveries or nearby property access
  • Aggressive or non-compliant road users
  • Confusion caused by unclear detours or blocked access
Monitoring, inspection and adjustment during the shift
  • Controls becoming ineffective during operations
  • Signs or barricades moved, damaged or obscured
  • Traffic queues or changed site conditions increasing exposure
  • Workers assuming setup remains safe without verification
Pack-up, removal and emergency response
  • Workers struck by vehicles during dismantling
  • Premature removal of controls exposing workers or road users
  • Emergency incident such as vehicle intrusion or injury during pack-up
  • Leaving hazards behind after removal

Need to tailor this risk assessment?

Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:

  • Model guidance: Model Code of Practice: Managing risks of plant in the workplace — Plant hazard identification — Traffic movements in the workplace; p. 17.
  • Model guidance: Model Code of Practice: Managing the risk of fatigue at work — Provide sufficient breaks while at work; p. 30.
  • Model guidance: Model Code of Practice: Managing the work environment and facilities — 2. The work environment; p. 13.
  • Model guidance: Model Code of Practice: First aid in the workplace — 3. First aid equipment, facilities and training; p. 12.
  • Model guidance: Model Code of Practice: Hazardous manual tasks — 4.1 The hierarchy of control measures; p. 31.
  • Model guidance: Model Code of Practice: How to manage work health and safety risks — 2. Step 1 — How to identify hazards; p. 12.

Standard Risk Assessment Features (Click to Expand)
  • Activity-specific hazard identification and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each activity
  • Risk matrix and assessment classification
  • Review, monitoring and sign-off fields
  • Site-specific customisation before use

Suitable for Industries

Transport and LogisticsCivil Construction and EarthworksMining and Resources

Related templates

$79.50

One-time payment