This SWMS covers tagging and isolation activities from planning and identifying energy sources through shutdown, isolation, verification and restoration.

Activities covered include

  • Review the work scope and plan the isolation
  • Apply physical isolations
  • Inspect tags and records, then restore and review

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Tagging and Isolation SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers tagging and isolation activities from planning and identifying energy sources through shutdown, isolation, verification and restoration. It supports managing work around equipment by addressing hazards from electrical, hydraulic, pneumatic, gravity, thermal and process energy.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review the work scope and plan the isolation
  • Obtain required permits and notify affected people
  • Prepare the work area and control access
  • Inspect isolation, tagging and test equipment
  • Identify all energy sources
  • Shut down equipment
  • Apply physical isolations
  • Release stored energy
  • Lock, tag and record isolation status
  • Prove zero energy before work begins
  • Perform authorised work under isolation
  • Inspect tags and records, then restore and review

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out tagging and isolation activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review scope and plan
  • Incorrect isolation scope
  • Unidentified energy sources
  • Unauthorised work
  • Conflicting activities
  • Unexpected plant start-up
Obtain permits and notify
  • Unauthorised switching
  • Loss of critical services
  • Exposure of other workers
  • Unplanned process release
Prepare work area
  • Unauthorised access
  • Electrical contact
  • Slips and trips
  • Vehicle interaction
  • Poor visibility
Inspect isolation equipment
  • Lockout device failure
  • Incorrect lockout fitment
  • Faulty test equipment
  • Illegible tags
  • Inadequate PPE
Identify all energy sources
  • Back-feed electrical supply
  • Stored hydraulic pressure
  • Pneumatic release
  • Gravity movement
  • Chemical or steam release
  • Unexpected equipment movement
Shut down equipment
  • Unexpected movement
  • Arc flash during switching
  • Process upset
  • Release of pressure
  • Entanglement
Apply physical isolations
  • Electric shock
  • Arc flash
  • Valve operation
  • Inadvertent energisation
  • Unexpected plant movement
  • Release of hazardous substances
Release stored energy
  • Hydraulic injection
  • Compressed-air release
  • Falling components
  • Spring release
  • Thermal burns
  • Residual electrical charge
Lock, tag and record
  • Unauthorised lock removal
  • Incorrect tag information
  • Group-isolation failure
  • Lost isolation status
  • Premature recommissioning
Prove zero energy
  • Electric shock
  • Arc flash
  • Unexpected start-up
  • Residual pressure
  • Stored energy release
  • Incorrect circuit identification
Perform authorised work
  • Isolation failure
  • Tools contacting live parts
  • Unexpected movement
  • Manual handling
  • Exposure to fluids or sharp edges
Inspect tags and records
  • Overdue electrical inspection
  • Defective portable equipment
  • False tag status
  • Missing inspection records
  • Use of out-of-service equipment
Restore and re-energise
  • Unexpected plant start-up
  • Electric shock
  • Arc flash
  • Plant damage
  • Release of pressure
  • Workers remaining in danger zone
Close out and review
  • Incomplete documentation
  • Recurring isolation failures
  • Unreported defects
  • Poor housekeeping
  • Unauthorised future use

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to provide safe systems of work, manage plant and electrical risks, consult workers, provide information, training, instruction and supervision, and prevent inadvertent re-energisation.
  • Model Code of Practice: Managing electrical risks in the workplace — use as guidance where adopted or approved in the relevant jurisdiction; includes isolation, locking, tagging, testing and re-testing principles.
  • Model Code of Practice: Managing the risks of plant in the workplace — use as guidance where adopted or approved; identifies all energy sources, controls stored energy, locks out isolation points, tags for information and tests the isolation.
  • Model Code of Practice: Confined spaces — use as guidance where applicable; requires hazardous plant and services to be isolated and isolation points checked before entry.
  • AS/NZS 4836 Safe working on or near low-voltage electrical installations and equipment.
  • AS/NZS 3760 In-service safety inspection and testing of electrical equipment.
  • AS/NZS 3012 Electrical installations—Construction and demolition sites.
  • AS 1319 Safety signs for the occupational environment.
  • AS 2865 Confined spaces, where confined-space isolation is required.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionManufacturing and ProductionElectrical and SolarMining and Resources

Related templates

$79.50