Activities covered include

  • Review the work scope and identify the plant
  • Control stored energy
  • Remove locks and test

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Isolation of Plant and Machinery SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers the isolation of plant and machinery from work-scope review and shutdown through energy isolation, stored-energy control, locking, verification, reinstatement and testing. It supports planning by addressing unexpected movement or start-up, electrical, hydraulic, pneumatic, thermal and stored-energy risks.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review the work scope and identify the plant
  • Set up the work area
  • Position plant safely
  • Shut down the plant
  • Identify isolation points
  • Isolate energy sources
  • Control stored energy
  • Apply personal locks
  • Prove zero energy
  • Perform authorised work
  • Inspect and reinstate the plant
  • Remove locks and test

Who is this for?

For contractors, workers, supervisors and businesses involved in authorised plant and machinery isolation activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review work scope
  • Incorrect plant identification
  • Unplanned energy source
  • Unauthorised work scope
  • Conflicting contractor activities
Set up work area
  • Unauthorised entry
  • Mobile plant interaction
  • Slip and trip hazards
  • Emergency access obstruction
Position plant safely
  • Plant movement
  • Roll-away
  • Crush from suspended parts
  • Hot surfaces
Shut down plant
  • Unexpected start-up
  • Product discharge
  • Mechanical entanglement
  • Alarm confusion
Identify isolation points
  • Wrong isolator operation
  • Back-feed energy
  • Unidentified stored energy
  • Electrical shock
Isolate energy sources
  • Electric shock
  • Hydraulic injection
  • Pneumatic release
  • Fire or fuel release
  • Unexpected movement
Control stored energy
  • Stored pressure release
  • Gravity drop
  • Spring release
  • Residual electrical charge
  • Thermal burns
Apply personal locks
  • Inadvertent re-energisation
  • Unauthorised lock removal
  • Multiple worker exposure
  • Incorrect tag information
Prove zero energy
  • Unexpected plant operation
  • Electric shock
  • Crushing and entanglement
  • Stored-energy release
Perform authorised work
  • Exposure to moving parts
  • Sharp edges and pinch points
  • Manual handling injury
  • Unexpected condition change
Inspect and reinstate
  • Tools left in plant
  • Missing guards
  • Incorrect assembly
  • Worker remaining in danger zone
Remove locks and test
  • Unexpected start-up
  • Plant malfunction
  • Ejected material
  • Unauthorised entry

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage plant risks, provide safe systems of work, consult workers, provide information, training and supervision, and prevent unauthorised interference with plant.
  • Model Code of Practice: Managing the Risks of Plant in the Workplace (guidance only; confirm adoption and status in the relevant jurisdiction). The Code sets out shut-down, identification of all energy sources and isolation points, isolation, stored-energy control, lock-out, tagging and safe test-out.
  • Model Code of Practice: Managing Electrical Risks in the Workplace (guidance only; confirm adoption and status in the relevant jurisdiction). It requires de-energised electrical equipment to be protected against inadvertent re-energisation and supports locking-off, tagging and verification.
  • AS 4024.1 Safety of machinery series, including principles for risk assessment, guarding and control systems.
  • AS/NZS 3012 Electrical installations—Construction and demolition sites, where applicable.
  • AS/NZS 3760 In-service safety inspection and testing of electrical equipment, where applicable.
  • AS/NZS 4836 Safe working on or near low-voltage electrical installations and equipment, where applicable.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections