Activities covered include

  • Plan the work and inspect the site
  • Terminate mains and earths
  • Label, secure, hand over and demobilise

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Switchboard Installation, Metering and Mains SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers switchboard installation, metering and mains work from planning and positioning through installation, testing, labelling and clean-up. It supports planning electrical work and managing hazards related to energised sources, arc flash, cables, service connections, lifting, drilling and access.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan the work and inspect the site
  • Set up access and exclusion zones
  • Deliver and position the switchboard
  • Mount cabinets and enclosures
  • Isolate existing electrical supplies
  • Install mains and submains
  • Terminate mains and earths
  • Install protection and control wiring
  • Install metering and relays
  • Connect the existing service panel
  • Test and commission the installation
  • Label, secure, hand over and demobilise

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out switchboard installation, metering and mains activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan work and inspect site
  • Unidentified electrical sources
  • Incorrect switchboard design
  • Unauthorised access
  • Asbestos-containing equipment
  • Poor access and lighting
  • Conflicting trades
Set up access and exclusion zone
  • Public entry
  • Trips and slips
  • Vehicle strike
  • Stored materials
  • Temporary electrical supply
Deliver and position switchboard
  • Crush from swinging load
  • Plant collision
  • Switchboard overturn
  • Manual handling strain
  • Damaged enclosure
Mount cabinet and enclosure
  • Electrical contact from adjacent circuits
  • Drilling into concealed services
  • Cabinet collapse
  • Metal swarf
  • Noise and flying debris
Isolate existing electrical supplies
  • Electric shock
  • Arc flash
  • Unexpected back-feed
  • Incorrect isolation
  • Automatic plant start
Install mains and submains
  • Contact with energised conductors
  • Cable handling strain
  • Cable insulation damage
  • Incorrect cable selection
  • Fire penetration defects
  • Falls from access equipment
Terminate mains and earths
  • Electric shock
  • Arc flash
  • Incorrect termination torque
  • Neutral or MEN fault
  • Exposed conductor ends
  • Dropped tools
Install protection and control wiring
  • Incorrect protection settings
  • Control circuit back-feed
  • Electric shock
  • Loose wiring
  • Incorrect RCD selection
  • Swarf in equipment
Install metering and relays
  • Current transformer secondary voltage
  • Incorrect meter connection
  • Metering supply shock
  • Unauthorised network work
  • Data communication failure
Connect existing service panel
  • Live consumer mains
  • Arc flash
  • Incorrect phase connection
  • Back-feed from solar or battery
  • Service fuse operation
  • Restricted workspace
Test and commission installation
  • Energised testing exposure
  • Arc flash
  • Unexpected equipment start
  • Incorrect polarity
  • RCD failure
  • Faulty protection settings
Label, secure and hand over
  • Misidentified circuits
  • Unauthorised re-energisation
  • Missing covers
  • Future maintenance exposure
  • Incomplete documentation
Clean up and demobilise
  • Sharp offcuts
  • Residual electrical hazards
  • Manual handling strain
  • Slip and trip hazards
  • Unauthorised access

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Applicable Commonwealth, state or territory electrical safety, electrical licensing, building and electricity supply laws.
  • Safe Work Australia model Code of Practice: Managing Electrical Risks in the Workplace, as adopted or applied in the relevant jurisdiction.
  • Safe Work Australia model Code of Practice: How to Manage Work Health and Safety Risks, as adopted or applied in the relevant jurisdiction.
  • Safe Work Australia model Code of Practice: Construction Work, as adopted or applied in the relevant jurisdiction.
  • AS/NZS 3000 Electrical installations (Wiring Rules).
  • AS/NZS 3012 Electrical installations—Construction and demolition sites.
  • AS/NZS 3017 Electrical installations—Verification guidelines.
  • AS/NZS 4836 Safe working on or near low-voltage and extra-low voltage electrical installations and equipment.
  • AS/NZS 3008.1 Electrical installations—Selection of cables.
  • AS/NZS 61439 Low-voltage switchgear and controlgear assemblies.
  • AS/NZS 3760 In-service safety inspection and testing of electrical equipment.
  • AS/NZS 60900 Live working—Hand tools for use up to 1,000 V AC and 1,500 V DC.
  • Model Codes and technical standards are guidance unless adopted, called up or otherwise made applicable in the relevant jurisdiction, contract or network requirement. The electrical-risk guidance requires effective isolation from all sources, locking/tagging and testing before work; it also identifies switchboard work near exposed live parts as a significant risk.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections