This risk assessment covers general electrical installation, wiring and switchboard activities, including planning, isolation, testing, installation and re-energisation.

Activities covered include

  • Assess the site, work scope, supplies and access conditions
  • Install wiring, pull cables and terminate conductors
  • Re-energise, test, commission and hand over the installation

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

General Electrical Installation, Wiring and Switchboards Risk Assessment
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This risk assessment covers general electrical installation, wiring and switchboard activities, including planning, isolation, testing, installation and re-energisation. It supports work planning by identifying electrical, access, equipment, environmental and handover risks that may need to be managed.

Activities & Risks Covered

This assessment addresses activities and risks including:

  • Assess the site, work scope, supplies and access conditions
  • Isolate and lock out circuits and switchboards
  • Test before touch and verify de-energised status
  • Access switchboards and existing electrical enclosures
  • Install wiring, pull cables and terminate conductors
  • Use portable tools, leads, ladders and test equipment
  • Work in restricted spaces and at height
  • Carry out energised testing, fault finding or justified live work
  • Re-energise, test, commission and hand over the installation

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out general electrical installation, wiring and switchboard activities.

Activities & Hazards Covered

Activity Potential Hazards
Planning and site assessment
  • Unidentified live services or multiple supply sources
  • Incorrect assumptions about existing circuits, switchboards or standby supplies
  • Poor access, lighting, ventilation or housekeeping creating electrical and physical risk
  • Unauthorised persons entering the work area
Isolation and lockout of circuits and switchboards
  • Electric shock from contact with energised conductors
  • Unexpected re-energisation by another person
  • Isolation of the wrong circuit or incomplete isolation
  • Exposure to live parts from multiple isolation points
Test before touch and verification of de-energised status
  • Contact with conductors believed to be dead but still energised
  • Induced voltage or changed conductor status during work
  • Faulty or incorrectly rated test instruments giving false readings
  • Shock during testing activities
Accessing switchboards and existing electrical enclosures
  • Arc flash or shock when removing covers or escutcheon plates
  • Exposure to damaged components, missing blanks or accessible live parts
  • Contact with aged materials such as asbestos-containing backing boards
  • Dropped tools or parts causing short circuit or injury
Wiring installation, pulling cables and terminating conductors
  • Cuts, punctures and hand injuries from cable ends, trays and enclosures
  • Manual handling strain from cable drums, ladders, switchgear components or awkward postures
  • Damage to cable insulation creating later shock or fire risk
  • Incorrect polarity, loose terminations or poor segregation of circuits
Using portable tools, leads, ladders and test equipment
  • Electric shock from damaged tools, leads or test gear
  • Use of conductive ladders or equipment near electrical parts
  • Trips from trailing leads and equipment
  • Injury from unfit-for-purpose or poorly maintained equipment
Work environment, access at height and confined or restricted spaces
  • Falls from ladders, platforms or ceiling spaces
  • Restricted movement leading to inadvertent contact with electrical parts
  • Heat, poor ventilation, low light or fatigue reducing concentration
  • Unsafe rescue access in roof spaces, pits, trenches or similar locations
Energised testing, fault finding or justified live electrical work
  • Serious electric shock or electrocution
  • Arc flash, burns and blast pressure
  • Unauthorised access to exposed live parts
  • Delayed rescue if an incident occurs
Re-energisation, testing, commissioning and handover
  • Shock, arc flash or fire on re-energisation due to wiring errors or faults
  • Unexpected start-up affecting workers still in the area
  • Leaving the installation unsafe, uncovered or incorrectly labelled
  • Others using defective or incomplete equipment

Need to tailor this risk assessment?

Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:

  • Model guidance: Model Code of Practice: Managing electrical risks in the workplace — 5. Isolation, locking off and access; p. 34.
  • Model guidance: Model Code of Practice: Managing the work environment and facilities — 2. The work environment; p. 13.
  • Model guidance: Model Code of Practice: Hazardous manual tasks — 4.1 The hierarchy of control measures; p. 31.
  • Model guidance: Model Code of Practice: How to manage and control asbestos in the workplace — 2.1. What is involved in managing risks?; p. 12.
  • Model guidance: Model Code of Practice: Managing the risk of fatigue at work — Provide sufficient breaks while at work; p. 30.
  • Model guidance: Model Code of Practice: How to manage work health and safety risks — 3. Step 2 — How to assess risks; p. 15.
  • Model guidance: Model Code of Practice: Excavation work — 2.3. Controlling the risks; p. 17.

Standard Risk Assessment Features (Click to Expand)
  • Activity-specific hazard identification and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each activity
  • Risk matrix and assessment classification
  • Review, monitoring and sign-off fields
  • Site-specific customisation before use

Suitable for Industries

Building and ConstructionElectrical and Solar