Shipping Container Handling and Twist Lock Operations SWMS
This SWMS covers shipping container handling and twist lock operations, from planning and traffic control through to lifting, placement and inspection.
Activities covered include
- Planning container work and reviewing available information
- Releasing trailer twist locks
- Inspecting completed work and reporting damage or hazards
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers shipping container handling and twist lock operations, from planning and traffic control through to lifting, placement and inspection. It supports the identification and management of risks associated with containers, vehicles, plant, suspended loads, doors, cargo and work areas.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Planning container work and reviewing available information
- Establishing traffic separation and exclusion controls
- Inspecting containers, landing areas and access conditions
- Completing straddle carrier pre-start checks
- Positioning trucks in the exchange area
- Releasing trailer twist locks
- Engaging spreaders and verifying container locks
- Lifting, transferring, stacking and placing containers
- Assessing containers before opening and opening doors
- Inspecting completed work and reporting damage or hazards
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out shipping container handling and twist lock operations.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan work and review documents |
|
| Establish traffic and exclusion controls |
|
| Inspect container and landing area |
|
| Complete straddle carrier pre-start |
|
| Position truck in exchange grid |
|
| Release trailer twist locks |
|
| Engage spreader and verify locks |
|
| Lift and transfer container |
|
| Stack or place container |
|
| Assess container before opening |
|
| Open container doors safely |
|
| Inspect and report completed work |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: Managing Risks in Stevedoring (2023), as adopted or applied in the relevant jurisdiction.
- Model Code of Practice: Managing the Risks of Plant in the Workplace, as adopted or applied in the relevant jurisdiction.
- Model Code of Practice: Managing the Risk of Falls at Workplaces, as adopted or applied in the relevant jurisdiction.
- Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace, as adopted or applied in the relevant jurisdiction.
- ISO 1161:2016 Series 1 freight containers—Corner and intermediate fittings.
- ISO 3874:2015 Series 1 freight containers—Handling and securing.
- AS/NZS 2210.3 Safety, protective and occupational footwear.
- AS/NZS 4602.1 High-visibility safety garments.
- AS/NZS 1270 Acoustics—Hearing protectors.
- AS/NZS 1337.1 Personal eye-protection.
- AS/NZS 1801 Occupational protective helmets.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment