This risk assessment covers refrigeration installation activities from site access and equipment movement through to testing, housekeeping and close-out.

Activities covered include

  • Assess site access, work conditions and existing services before work begins.
  • Handle refrigerant charging and leak management activities.
  • Remove waste, maintain housekeeping and communicate close-out information.

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Refrigeration Installation Risk Assessment
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This risk assessment covers refrigeration installation activities from site access and equipment movement through to testing, housekeeping and close-out. It supports planning by identifying hazards that may need to be considered when managing the work.

Activities & Risks Covered

This assessment addresses activities and risks including:

  • Assess site access, work conditions and existing services before work begins.
  • Manage delivery, unloading and movement of refrigeration equipment and materials.
  • Plan electrical isolation, connection and temporary power activities.
  • Manage access to roofs, ceiling spaces and elevated plant areas.
  • Control cutting, brazing, welding and other hot work activities.
  • Handle refrigerant charging and leak management activities.
  • Plan work in confined or poorly ventilated areas.
  • Install and fix pipework, including pressure testing activities.
  • Manage commissioning, functional testing and fault-finding activities.
  • Remove waste, maintain housekeeping and communicate close-out information.

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out refrigeration installation activities.

Activities & Hazards Covered

Activity Potential Hazards
Site access, assessment and service identification
  • Unidentified live electrical, gas, water, sewer, chemical or refrigerant services
  • Unauthorised access by occupants, trades or visitors into the work area
  • Poor lighting, restricted access and unsuitable work environment
  • Interaction with other trades creating conflicting hazards
Delivery, unloading and movement of refrigeration equipment
  • Crush injuries from moving plant or suspended loads
  • Strains and sprains from lifting condensers, pipe, cylinders and tools
  • Slips, trips and falls while moving bulky items through plant rooms or roofs
  • Vehicle interaction during delivery and unloading
Electrical isolation and connection work
  • Electric shock, arc flash or burns from contact with energised parts
  • Unexpected energisation during installation or testing
  • Damaged leads, tools or temporary power supplies
  • Electrical work in wet or confined areas
Working at height and accessing roofs, ceiling spaces or elevated plant
  • Falls from ladders, roofs, platforms or edges
  • Falling objects striking workers or people below
  • Fragile surfaces, poor edge protection or unstable access equipment
  • Heat, wind or weather affecting safe access and concentration
Cutting, brazing, welding and other hot work
  • Fire or explosion from ignition of flammable vapours, gases or nearby combustibles
  • Burns from hot metal, torches and heated pipework
  • Fume exposure in enclosed or poorly ventilated areas
  • Ignition of insulation, dust, oil residues or refrigerant-related contaminants
Refrigerant handling, charging and leak management
  • Exposure to refrigerant causing asphyxiation, frost burns or toxic effects
  • Pressure release from hoses, gauges, cylinders or system components
  • Environmental release from poor connections or damaged equipment
  • Use of incorrect refrigerant or incompatible components
Confined or poorly ventilated work areas
  • Oxygen deficiency or build-up of refrigerant, fumes or exhaust gases
  • Fire or explosion where flammable gas or vapour is present
  • Restricted entry and exit delaying evacuation or rescue
  • Additional strain from heat, awkward posture and PPE in tight spaces
Pipework installation, fixing and pressure testing
  • Stored energy release during pressure testing or from pressurised components
  • Eye and face injuries from flying debris, fittings or ruptured hoses
  • Cuts from sharp edges, swarf and sheet metal
  • Noise, vibration and contact with tools or rotating equipment
Commissioning, functional testing and fault finding
  • Exposure to energised equipment, moving fans or rotating parts
  • Unexpected start-up of plant during testing
  • Noise, vibration, heat or cold discharge from operating equipment
  • Refrigerant or oil leaks identified under operating pressure
Waste removal, housekeeping and close-out
  • Trips, slips and puncture injuries from offcuts, packaging, swarf and discarded fittings
  • Incorrect storage or disposal of refrigerant cylinders, oils and hazardous chemical waste
  • Residual hazards left for occupants or maintenance workers
  • Failure to communicate isolations, defects or incomplete work

Need to tailor this risk assessment?

Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:

  • Model guidance: Model Code of Practice: Managing the work environment and facilities — 2. The work environment; p. 13.
  • Model guidance: Model Code of Practice: Managing risks of hazardous chemicals in the workplace — 2.2 Safety Data Sheets (SDS); p. 16.
  • Model guidance: Model Code of Practice: Hazardous manual tasks — 4.1 The hierarchy of control measures; p. 31.
  • Model guidance: Model Code of Practice: Confined spaces — 3.4 Assessing the risks; p. 24.
  • Model guidance: Model Code of Practice: Managing the risk of falls at workplaces — 3.2 Identifying the hazards; p. 16.
  • Model guidance: Model Code of Practice: Managing noise and preventing hearing loss at work — 5. Controlling the risks; p. 29.
  • Model guidance: Model Code of Practice: Managing electrical risks in the workplace — 2.1 Identifying the hazards; p. 14.
  • Model guidance: Model Code of Practice: Work health and safety consultation, cooperation and coordination — 3. What is effective consultation?; p. 13.
  • Model guidance: Model Code of Practice: First aid in the workplace — 3. First aid equipment, facilities and training; p. 12.
  • Model guidance: Model Code of Practice: Managing risks of plant in the workplace — Plant hazard identification — Traffic movements in the workplace; p. 17.
  • Model guidance: Model Code of Practice: How to manage work health and safety risks — 4. Step 3 — How to control risks; p. 20.

Standard Risk Assessment Features (Click to Expand)
  • Activity-specific hazard identification and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each activity
  • Risk matrix and assessment classification
  • Review, monitoring and sign-off fields
  • Site-specific customisation before use

Suitable for Industries

Air Conditioning and Refrigeration

Related templates

$79.50

One-time payment