BlueSafe

Live Electrical Work, Testing and Fault Finding SWMS

This SWMS covers planning, isolation, diagnostics, authorised energised testing, repair and restoration for live electrical work, testing and fault finding.

Activities covered include

  • Plan the work scope and review fault information
  • Carry out de-energised diagnostics
  • Complete close-out and handover

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Live Electrical Work, Testing and Fault Finding SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers planning, isolation, diagnostics, authorised energised testing, repair and restoration for live electrical work, testing and fault finding. It supports work planning and risk management by addressing electrical exposure, switching, access and handover activities.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan the work scope and review fault information
  • Set up and control the work area
  • Inspect test equipment, insulated tools and PPE
  • Isolate energy sources and prove the de-energised condition
  • Carry out de-energised diagnostics
  • Authorise and perform energised testing
  • Access and work within HV switchyard areas
  • Repair, secure, test and restore equipment
  • Complete close-out and handover

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out live electrical work, testing and fault finding.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan work and review scope
  • Incorrect fault information
  • Unidentified energy sources
  • Unplanned energised work
  • Inadequate worker competency
  • Fatigue-related error
Establish work area
  • Unauthorised entry
  • Contact with live parts
  • Trips from leads
  • Vehicle interaction
  • Poor emergency access
Inspect equipment and PPE
  • Defective test instruments
  • Damaged insulated tools
  • Arc-flash injury
  • Electric shock
  • Static discharge
Isolate all energy sources
  • Unexpected energisation
  • Backfeed voltage
  • Stored electrical energy
  • Automatic plant start
  • Electric shock
Prove de-energised condition
  • Misidentified conductors
  • Residual voltage
  • Induced voltage
  • Backfeed supply
  • Electric shock
Conduct de-energised diagnostics
  • Stored energy release
  • Short circuit
  • Damaged insulation
  • Exposed conductors
  • Transformer oil exposure
Authorise energised testing
  • Electric shock
  • Arc flash
  • Arc blast
  • Inadequate risk assessment
  • Uncontrolled switching
Perform live testing
  • Contact with electricity
  • Arc flashing
  • Probe slip
  • Exposed live wiring
  • Short circuit from test leads
Access HV switchyard
  • High-voltage electrocution
  • Step and touch potential
  • Induced voltage
  • Unauthorised switching
  • Arc blast
Repair and secure equipment
  • Inadvertent energisation
  • Incorrect connections
  • Exposed wires
  • Fire from loose terminals
  • Manual handling strain
Test and restore supply
  • Unexpected plant start
  • Electrical fire
  • Arc flash during switching
  • Incorrect phase rotation
  • Workers exposed to energisation
Close out and hand over
  • Unfinished electrical work
  • Incorrect equipment status
  • Unauthorised access
  • Residual trip hazards
  • Loss of fault records

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model Code of Practice: Managing electrical risks in the workplace — guidance only; confirm adoption and currency in the relevant jurisdiction. The Code requires de-energised testing to be attempted before energised fault finding and identifies controls for energised testing.
  • Model Code of Practice: How to manage work health and safety risks — guidance only; use for consultation, hazard identification, risk control and review.
  • Model Code of Practice: Construction work — guidance only; use where the work is construction work or involves high-risk construction work.
  • AS/NZS 4836, Safe working on or near low-voltage and extra-low voltage electrical installations and equipment.
  • AS/NZS 3000, Electrical installations (Wiring Rules).
  • AS/NZS 3017, Electrical installations — Verification guidelines.
  • AS/NZS 60900, Live working — Hand tools for use up to 1,000 V AC and 1,500 V DC.
  • AS/NZS 3760, In-service safety inspection and testing of electrical equipment.
  • Applicable network operator rules, asset-owner switching procedures, electrical safety regulator requirements and manufacturer instructions.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionManufacturing and ProductionElectrical and SolarMining and Resources

Related templates

$79.50

$96.80

Save $17.30

One-time payment