BlueSafe

Laying of Pipes and Culverts SWMS

This SWMS covers planning, excavation, placement, joining and backfilling work for pipes and culverts.

Activities covered include

  • Plan the work sequence and site controls
  • Lower pipes into trenches
  • Reinstate the area and demobilise

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Laying of Pipes and Culverts SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers planning, excavation, placement, joining and backfilling work for pipes and culverts. It supports planning and managing risks from services, excavations, plant, suspended loads, pipe movement, dust and site conditions.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan the work sequence and site controls
  • Receive pipes and culverts
  • Locate and expose services
  • Position plant and excavate
  • Prepare trench bedding
  • Lower pipes into trenches
  • Join and align pipes
  • Install culvert structures
  • Backfill and compact
  • Reinstate the area and demobilise

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out pipe and culvert installation activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Pre-start planning
  • Unplanned work sequence
  • Inadequate worker competency
  • Weather exposure
  • Emergency delay
Establish site controls
  • Unauthorised access
  • Vehicle-pedestrian interaction
  • Public exposure
  • Uneven ground
Receive pipes and culverts
  • Falling pipe bundles
  • Crush from suspended load
  • Load shift from truck
  • Manual handling strain
Locate and expose services
  • Underground services strike
  • Electric shock
  • Gas release
  • Water inundation
  • Service damage
Position plant and excavate
  • Trench collapse
  • Plant roll-over
  • Swinging counterweight
  • Worker struck by plant
  • Falling into excavation
  • Spoil surcharge
Prepare trench bedding
  • Trench collapse
  • Silica dust
  • Plant interaction
  • Manual handling strain
  • Uneven trench base
Lower pipes into trench
  • Crush from suspended pipe
  • Pipe roll or swing
  • Lifting gear failure
  • Trench collapse
  • Pinch-point injury
Join and align pipes
  • Hand crush injury
  • Unexpected pipe movement
  • Sealant exposure
  • Trench collapse
  • Awkward postures
Install culvert structures
  • Crush from precast units
  • Structural instability
  • Suspended load
  • Falls into excavation
  • Concrete dust
Backfill and compact
  • Plant strike
  • Pipe damage
  • Trench collapse
  • Dust and noise
  • Flying material
Reinstate and demobilise
  • Open excavation
  • Residual plant movement
  • Slips and trips
  • Fuel or chemical spill
  • Unsecured materials

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, provide safe plant and systems of work, consult workers, provide suitable training and supervise work.
  • Model Code of Practice: Construction work — guidance for construction SWMS, essential services, excavation controls, trench support and securing excavations. Current service information must be obtained and made available before excavation; trenches of 1.5 m or deeper require appropriate support and access control.
  • Model Code of Practice: Managing the risks of plant in the workplace — guidance for plant selection, inspection, maintenance, operator competence, traffic separation and exclusion zones.
  • Model Code of Practice: How to manage work health and safety risks — guidance for applying the hierarchy of controls, consultation and review of controls.
  • Model Code of Practice: Confined spaces — guidance where pits, manholes, pipes or culverts require entry; provide suitable training, permit controls and emergency arrangements.
  • AS 4744.1 Excavation safety — guidance for trenching and protective systems.
  • AS 2550 series Cranes, hoists and winches — safe use guidance for lifting operations.
  • AS 4991 Lifting devices — guidance for lifting precast concrete elements.
  • AS/NZS 1576 series Scaffolding and AS/NZS 1657 Fixed platforms, walkways, stairways and ladders — guidance where temporary access systems are used.
  • AS 1742.3 Manual of uniform traffic control devices, Part 3: Traffic control for works on roads — guidance for work near traffic corridors.
  • AS/NZS 1715 and AS/NZS 1716 — guidance for respiratory protective equipment.
  • AS/NZS 2210.3 Safety, protective and occupational footwear; AS/NZS 1801 Occupational protective helmets; AS/NZS 4602.1 High-visibility safety garments; AS/NZS 1270 Hearing protectors.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionCivil Construction and EarthworksMining and ResourcesPlumbing and Gasfitting

Related templates

$79.50

$96.80

Save $17.30

One-time payment