BlueSafe

Heavy Infrastructure Bridge and Dam Construction SWMS

This SWMS covers mobilisation, access, excavation, structural work, concrete work, water management and demobilisation for bridge and dam construction.

Activities covered include

  • Plan the work and mobilise to site
  • Install formwork and falsework
  • Clean up and demobilise the work area

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Heavy Infrastructure Bridge and Dam Construction SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers mobilisation, access, excavation, structural work, concrete work, water management and demobilisation for bridge and dam construction. It supports planning and managing risks from plant, cranes, excavations, work at height, lifting, weather, water and changing site conditions.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan the work and mobilise to site
  • Establish access and traffic controls
  • Position plant and cranes
  • Excavate foundations and cofferdams
  • Place earth-fill dam materials
  • Install formwork and falsework
  • Lift precast and structural components
  • Erect bridge and vertical structures
  • Place concrete and grout
  • Manage work at heights, confined spaces, welding, water and weather risks
  • Clean up and demobilise the work area

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out bridge and dam construction activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Pre-start planning and mobilisation
  • Uncoordinated construction activities
  • Design change or temporary works failure
  • Unauthorised site entry
  • Inadequate emergency response
  • Fatigue and heat stress
Establish access and traffic controls
  • Public vehicle impact
  • Plant-pedestrian collision
  • Unauthorised access
  • Vehicle roll-over
  • Reversing vehicle strike
Position plant and cranes
  • Plant roll-over
  • Crane overturning
  • Crush from slewing plant
  • Underground service strike
  • Overhead powerline contact
  • Hydraulic failure
Excavate foundations and cofferdams
  • Excavation collapse
  • Water inundation
  • Underground services strike
  • Fall into excavation
  • Plant entering excavation
  • Contaminated atmosphere
  • Rock or soil fall
Place earth-fill dam materials
  • Embankment instability
  • Plant collision
  • Plant roll-over
  • Dust exposure
  • Waterway pollution
  • Compactor vibration
Install formwork and falsework
  • Falsework collapse
  • Falling objects
  • Fall from height
  • Crush during assembly
  • Concrete loading failure
  • Temporary support failure
Lift precast and structural components
  • Dropped load
  • Crush from swinging load
  • Rigging failure
  • Crane overload
  • Precast panel instability
  • Powerline contact
Erect bridge and vertical structures
  • Structural collapse
  • Fall from height
  • Falling tools
  • Crush at connections
  • Wind loading
  • Incomplete bolted connection
Place concrete and grout
  • Pump hose failure
  • Concrete burns
  • Boom strike
  • Formwork overload
  • Silica dust
  • Vehicle interaction
Work at heights and edges
  • Fall over edge
  • Fall through opening
  • Fall from ladder
  • Falling objects
  • Suspension trauma
  • Rescue delay
Enter silos and confined spaces
  • Grain engulfment
  • Oxygen deficiency
  • Toxic atmosphere
  • Engulfment by water
  • Mechanical entanglement
  • Restricted rescue access
Electrical welding and cutting
  • Electric shock
  • Fire and explosion
  • Arc flash
  • Welding fumes
  • Gas cylinder rupture
  • Burns
Manage water and weather risks
  • Drowning
  • Flooding
  • Lightning strike
  • High winds
  • Heat illness
  • Slip on wet surfaces
Clean up and demobilise
  • Residual stored energy
  • Plant strike
  • Unstable materials
  • Trips and slips
  • Environmental spill
  • Unauthorised re-entry

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage construction risks, consult workers, provide safe plant and systems of work, and prepare and implement SWMS for applicable high risk construction work.
  • Model WHS Regulations, Chapter 6 construction work and high risk construction work categories, used as national guidance only and subject to local jurisdictional adoption.
  • Model Code of Practice: How to Manage Work Health and Safety Risks, including application of the hierarchy of controls and review of controls.
  • Model Code of Practice: Managing the Risk of Falls at Workplaces, including edge protection and controls for falls through openings.
  • Model Code of Practice: Managing Risks of Plant in the Workplace, including separation of people and mobile plant.
  • Model Code of Practice: Excavation Work; Model Code of Practice: Confined Spaces; Mobile Crane Code of Practice; Concrete Pumping Code of Practice; Traffic Management for Construction or Maintenance Work; and Managing Electrical Risks in the Workplace.
  • Technical guidance: AS 2550 series Cranes; AS 1418 series Cranes, hoists and winches; AS 4991 Lifting devices; AS 3610 Formwork for concrete; AS 3600 Concrete structures; AS 4100 Steel structures; AS/NZS 1576 Scaffolding; AS/NZS 1891 Industrial fall-arrest systems; AS 1657 Fixed platforms, walkways, stairways and ladders; AS 2865 Confined spaces; AS 4744 Work in or near excavations; AS 3798 Earthworks; AS 1742.3 Traffic control devices for works on roads; and relevant manufacturer instructions.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionCivil Construction and EarthworksMining and ResourcesConcrete and Formwork

Related templates

$79.50

$96.80

Save $17.30

One-time payment