General Concreting Pouring and Footings SWMS
This SWMS covers general concreting, pouring and footing work from planning and excavation through preparation, placement, finishing, curing and handover.
Activities covered include
- Plan the work and establish the site
- Set up the concrete pump
- Clean tools, manage washout and complete handover
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers general concreting, pouring and footing work from planning and excavation through preparation, placement, finishing, curing and handover. It supports work planning and risk management for services, plant, formwork, reinforcement, concrete handling and washout.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the work and establish the site
- Locate services and excavate footings
- Position plant and delivery vehicles
- Prepare the subgrade and base
- Install formwork and moulds
- Fix reinforcement and fibres
- Set up the concrete pump
- Manually mix cement and sand where required
- Place footings, slabs and paths
- Vibrate, screed and finish concrete
- Cure and cover fresh concrete
- Clean tools, manage washout and complete handover
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out general concreting, pouring and footing activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan work and establish site |
|
| Locate services and excavate footings |
|
| Position plant and delivery vehicles |
|
| Prepare subgrade and base |
|
| Install formwork and moulds |
|
| Fix reinforcement and fibres |
|
| Set up concrete pump |
|
| Manually mix cement and sand |
|
| Place footings slabs and paths |
|
| Vibrate screed and finish concrete |
|
| Cure and cover fresh concrete |
|
| Clean tools and manage washout |
|
| Demobilise and complete handover |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: Construction Work — guidance only; confirm whether adopted or approved in the relevant jurisdiction.
- Model Code of Practice: Excavation Work — guidance only; confirm whether adopted or approved in the relevant jurisdiction.
- Model Code of Practice: Formwork — guidance only; confirm whether adopted or approved in the relevant jurisdiction.
- Model Code of Practice: Concrete Pumping — guidance only; confirm whether adopted or approved in the relevant jurisdiction.
- Model Code of Practice: Hazardous Manual Tasks — guidance only; confirm whether adopted or approved in the relevant jurisdiction.
- Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace — guidance only; confirm whether adopted or approved in the relevant jurisdiction.
- Model Code of Practice: Managing the Risks of Respirabile Crystalline Silica in the Workplace — guidance only; confirm whether adopted or approved in the relevant jurisdiction.
- Model Code of Practice: Managing Electrical Risks in the Workplace — guidance only; confirm whether adopted or approved in the relevant jurisdiction.
- Australian Standards guidance: AS 1379 Specification and supply of concrete; AS 2870 Residential slabs and footings; AS 3600 Concrete structures; AS 3610 Formwork for concrete; AS 3798 Guidelines on earthworks; AS 1418.15 Concrete placing equipment; AS 2550.15 Cranes—Safe use—Concrete placing equipment; AS/NZS 3012 Electrical installations—Construction and demolition sites.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment