This risk assessment covers general concreting, pouring and footing activities, from planning and excavation work through formwork, placement, clean-up and changing conditions.

Activities covered include

  • Plan work around site conditions and services
  • Manage overhead and underground electrical risks
  • Respond to defects, emergencies and changing conditions

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

General Concreting Pouring and Footings Risk Assessment
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This risk assessment covers general concreting, pouring and footing activities, from planning and excavation work through formwork, placement, clean-up and changing conditions. It supports work planning by identifying ground, plant, electrical, concrete, manual handling, access and emergency risks that may need to be managed.

Activities & Risks Covered

This assessment addresses activities and risks including:

  • Plan work around site conditions and services
  • Work around excavations and footing edges
  • Set up and work around formwork, reinforcement and pour decks
  • Manage mobile plant, concrete trucks and site traffic
  • Use pump lines, hoses and concrete placement equipment
  • Manage overhead and underground electrical risks
  • Handle hoses, mesh, timber, tools and other materials
  • Work with wet concrete, cement products and additives
  • Manage slips, trips, falls and access around the pour
  • Respond to defects, emergencies and changing conditions

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out general concreting, pouring and footing activities.

Activities & Hazards Covered

Activity Potential Hazards
Planning, site conditions and services
  • Unidentified underground or overhead services
  • Poor ground conditions around footings, trenches or plant set-up areas
  • Weather, water ingress or washout affecting stability
  • Unauthorised access by other trades or the public
Excavations and footing edges
  • Collapse of excavation sides
  • Falls into trenches, footing excavations or penetrations
  • Workers or plant too close to excavation edges
  • Water accumulation causing slip, engulfment or instability
Formwork, reinforcement and pour deck stability
  • Collapse or movement of formwork or falsework during the pour
  • Impalement or lacerations from exposed reinforcement
  • Trips on reo, braces, form ties and uneven work areas
  • Premature loading of incomplete or altered formwork
Mobile plant, concrete trucks and traffic interaction
  • Workers struck by reversing or slewing plant
  • Collision between agitators, pumps, delivery vehicles and site traffic
  • Public or other trades entering the operating area
  • Plant overturning due to poor ground or set-up
Pump lines, hoses and concrete placement equipment
  • Hose whip, line failure or release of pressurised concrete
  • Workers struck by moving booms, lines or clamps
  • Pinch points during set-up, adjustment or cleaning
  • Uncontrolled movement from blockages or poor restraint
Overhead and underground electrical risks
  • Contact with overhead powerlines by booms, trucks, lines or tools
  • Electric shock from damaged leads, temporary power or wet conditions
  • Underground electrical service strike during footing work
  • Conductive equipment increasing shock risk
Manual handling and hand tools
  • Musculoskeletal injuries from lifting hoses, mesh, timber, pins, tools or materials
  • Crush or pinch injuries to hands and feet
  • Strains from awkward postures in footing excavations or around forms
  • Cuts from wire, reo ends or hand tools
Wet concrete, cement products and hazardous substances
  • Skin burns, dermatitis or eye injuries from wet concrete, cement, additives or slurry
  • Exposure to respirable crystalline silica from cutting, drilling, grinding, chipping or dry clean-up of concrete materials
  • Inhalation of fumes or mists from chemicals and admixtures
  • Environmental contamination from uncontrolled washout or slurry
Slips, trips, falls and work at height around the pour
  • Slips on wet concrete, slurry, mud or uneven ground
  • Trips over hoses, braces, reo, leads and materials
  • Falls from edges, decks, steps or incomplete access systems
  • Dropped tools or materials striking persons below
Emergency response, defects and changing conditions
  • Delayed response to injury, concrete burns, collapse, electrical incident or plant emergency
  • Workers continuing after discovering defects or unsafe changes
  • Poor communication during noise, weather or multiple simultaneous tasks
  • Fatigue and reduced attention during extended pours

Need to tailor this risk assessment?

Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:

  • Model guidance: Model Code of Practice: Excavation work — 2.3. Controlling the risks; p. 17.
  • Model guidance: Model Code of Practice: Managing electrical risks in the workplace — 2.1 Identifying the hazards; p. 14.
  • Model guidance: Model Code of Practice: Managing the risk of falls at workplaces — 3.2 Identifying the hazards; p. 16.
  • Model guidance: Model Code of Practice: Managing the work environment and facilities — 1.2 Managing risks associated with the work environment and facilities; p. 12.
  • Model guidance: Model Code of Practice: Hazardous manual tasks — 4.1 The hierarchy of control measures; p. 31.
  • Model guidance: Model Code of Practice: Managing the risk of fatigue at work — Provide sufficient breaks while at work; p. 30.
  • Model guidance: Model Code of Practice: Managing risks of plant in the workplace — Plant hazard identification — Traffic movements in the workplace; p. 17.
  • Model guidance: Model Code of Practice: Managing risks of hazardous chemicals in the workplace — 2.1 How to identify which chemicals are hazardous; p. 15.
  • Model guidance: Model Code of Practice: Construction work — 6.2 Workplace specific induction training; p. 41.
  • Model guidance: Model Code of Practice: First aid in the workplace — 3. First aid equipment, facilities and training; p. 12.
  • Model guidance: Model Code of Practice: How to manage work health and safety risks — 2. Step 1 — How to identify hazards; p. 12.

Standard Risk Assessment Features (Click to Expand)
  • Activity-specific hazard identification and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each activity
  • Risk matrix and assessment classification
  • Review, monitoring and sign-off fields
  • Site-specific customisation before use

Suitable for Industries

Building and ConstructionCivil Construction and EarthworksConcrete and Formwork