Event Setup Decorating and Infrastructure SWMS
This SWMS covers event setup, decorating and infrastructure work from pre-start planning through to monitoring, pack-down and demobilisation.
Activities covered include
- Complete pre-start planning
- Install elevated decorations
- Inspect, monitor, pack down and demobilise
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers event setup, decorating and infrastructure work from pre-start planning through to monitoring, pack-down and demobilisation. It supports planning and risk management for access, plant, temporary structures, decorations, lighting, power, stands and event conditions.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Complete pre-start planning
- Isolate the site and manage access
- Unload materials and plant
- Position plant and equipment
- Install temporary structures
- Install ground-level decorations
- Install elevated decorations
- Install event lighting
- Connect catering van power
- Set up food and beverage stands
- Install sporting infrastructure
- Inspect, monitor, pack down and demobilise
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out event setup, decorating or infrastructure activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Pre-start planning |
|
| Site isolation and access |
|
| Unload materials and plant |
|
| Position plant and equipment |
|
| Install temporary structures |
|
| Install ground-level decorations |
|
| Install elevated decorations |
|
| Install event lighting |
|
| Connect catering van power |
|
| Set up food and beverage stands |
|
| Install sporting infrastructure |
|
| Final inspection and handover |
|
| Monitor during event |
|
| Pack-down and demobilisation |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to consult, identify hazards, apply the hierarchy of controls, provide information/training/supervision, maintain controls and manage construction work where the activity meets the relevant definition.
- Model Code of Practice: Construction Work — guidance for SWMS, essential services, lighting, heat, outdoor work and construction-site management; model Codes are guidance unless adopted or approved in the relevant jurisdiction.
- Model Code of Practice: Managing Electrical Risks in the Workplace — guidance for isolation, competent electrical workers, RCD protection, inspection/testing and electrical emergency arrangements.
- Model Code of Practice: Managing the Risk of Falls at Workplaces — guidance for safe access, elevated work, temporary work platforms and fall prevention.
- Model Code of Practice: Managing Risks of Plant in the Workplace — guidance for plant pre-starts, lifting, traffic separation, exclusion zones and maintenance.
- Model Code of Practice: Hazardous Manual Tasks; Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace.
- Technical guidance: AS/NZS 3000 Electrical installations; AS/NZS 3002 Electrical installations—shows and carnivals; AS/NZS 3012 Electrical installations—construction and demolition sites; AS/NZS 3760 In-service safety inspection and testing of electrical equipment; AS/NZS 1891 Industrial fall-arrest systems; AS/NZS 1576 Scaffolding; AS 1418 Cranes; AS 2550 Cranes—safe use; AS/NZS 4994 Temporary fencing and hoardings; AS/NZS 1170.2 Structural design actions—wind actions; and relevant manufacturer instructions.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment