
Plumbing Pipe Work and Pipefitting SWMS
- -100% Compliant with Australian WHS Acts & Regulations
- -Fully Editable MS Word & PDF Formats Included
- -Pre-filled Content - Ready to Deploy Immediately
- -Customisable - Easily Add Your Logo & Site Details
- -Includes 2 Years of Free Compliance Updates
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Product Overview
This SWMS covers plumbing pipe work and pipefitting, from site review and isolations through pipe preparation, installation, joining, testing and handover. It supports planning for services, materials, tools, pressure, chemicals and work-access hazards.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Review the work scope, inspect the site and establish isolations
- Unload, position and handle pipes, fittings and materials
- Prepare tools, machinery and work openings
- Cut, prepare, bend and form pipework
- Install pipe supports and pipework
- Join copper pipework
- Join PVC pipework and install valves
- Freeze and replace pipe sections where required
- Pressure test chilled-water pipes
- Disinfect and commission pipeline work
- Clean up and hand over the work area
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out plumbing pipe work and pipefitting activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Review scope and inspect site |
|
| Establish isolations and access |
|
| Unload and position materials |
|
| Prepare tools and machinery |
|
| Mark, drill and core openings |
|
| Cut and prepare pipework |
|
| Bend and form pipe |
|
| Install supports and pipework |
|
| Join copper pipework |
|
| Join PVC and install valves |
|
| Freeze and replace pipe sections |
|
| Pressure test chilled-water pipes |
|
| Disinfect and commission pipeline |
|
| Clean up and hand over |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to consult, identify hazards, eliminate or minimise risks so far as reasonably practicable, provide safe plant and systems of work, and maintain controls.
- Applicable Commonwealth, state or territory plumbing, gas, building, electrical safety, environmental and public-health legislation, regulations and licensing requirements.
- Safe Work Australia model Code of Practice: Construction Work (2024) — use as guidance only; confirm whether adopted or otherwise applicable in the relevant jurisdiction.
- Model Codes of Practice: How to Manage Work Health and Safety Risks; Managing Risks of Plant in the Workplace; Hazardous Manual Tasks; Managing Risks of Hazardous Chemicals in the Workplace; Managing the Work Environment and Facilities; Managing Noise and Preventing Hearing Loss at Work; Managing the Risk of Falls at Workplaces; Confined Spaces; Welding Processes; How to Manage and Control Asbestos in the Workplace; and How to Safely Remove Asbestos. Model and approved codes do not automatically have legal effect in every jurisdiction.
- AS/NZS 3500 Plumbing and Drainage series; AS/NZS 5601 Gas Installations series where gas work is within scope; AS 1345 Identification of the contents of pipes; AS 1319 Safety signs for the occupational environment; AS/NZS 1715 and AS/NZS 1716 respiratory protective equipment; AS/NZS 1337.1 eye and face protection; AS/NZS 1270 hearing protectors; AS/NZS 2210.3 protective footwear; AS/NZS 1801 industrial safety helmets; AS/NZS 1891 fall-arrest systems; AS/NZS 4576 scaffolding guidelines; and manufacturer instructions.
- AS 4041 Pressure piping and applicable project specifications for pressure piping, testing, supports, isolation and commissioning. The model WHS Regulations define pressure piping as an assembly of pipes, fittings, valves, supports and pressure-containing accessories.
- Safe Work Australia model codes are national guidance prepared for possible adoption; WHS laws are regulated and enforced by the Commonwealth, states and territories in their respective jurisdictions.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
$79.50
$96.80