The safe way to work at an agricultural show or carnival is to plan for a temporary, crowded and constantly changing workplace. Builders, subcontractors, supervisors and tradies need to coordinate with the organiser, understand the event layout and control interactions between workers, vehicles, structures, animals, equipment and the public.

Bump-in, event operation and bump-out should be treated as separate work phases. Access routes, public areas, weather conditions and nearby activities can change between phases, so controls must remain practical and visible on site.

Main hazards

Agricultural shows and carnivals bring together hazards that are often managed separately on a normal construction site. Common examples include:

  • trucks, forklifts, tractors and mobile plant moving near workers or patrons
  • temporary stages, marquees, stalls, fencing, seating and signs
  • electrical leads, generators and switchboards exposed to weather, animals or traffic
  • installation and dismantling work involving lifting or work at height
  • underground services affected by pegs, anchors or excavation
  • animals moving through loading, holding or public areas
  • crowds entering incomplete or restricted work zones
  • LPG, hot work, cooking equipment and combustible materials
  • uneven ground, poor lighting, noise, dust, heat, rain and strong winds
  • fatigue, rushed schedules and several contractors working at once.

Good controls follow the hierarchy of control. Eliminate the hazard where practicable, then consider substitution, isolation and engineering controls before relying on procedures, signs or personal protective equipment.

What should be sorted before work starts?

Confirm the scope, work area, timing and responsible contacts with the event organiser or person controlling the site. Obtain the current layout and identify delivery routes, pedestrian paths, public opening times, animal areas, emergency access, services and restricted zones.

Contractors should plan their work, identify hazards and complete a risk assessment suited to the actual contract. Check that plant is suitable and inspected, workers have the required competence for their tasks, and the crew has received relevant site information, instruction and supervision.

Before mobilisation, agree on:

  • where vehicles may enter, unload, turn and park
  • how work areas will be isolated from patrons and other contractors
  • who may change barriers, structures, electrical supplies or traffic routes
  • how weather will be monitored and who can stop the work
  • how incomplete structures and equipment will be secured
  • where emergency isolation points, first aid and assembly areas are located
  • how incidents, hazards and changed conditions will be reported.

Organisers and contractors should not assume that allocating a task transfers every safety responsibility. Shared risks require communication, cooperation and active monitoring.

What good controls and documents usually cover

Temporary facilities should be installed and maintained so they do not create risks. This includes stages, portable shelters, public stands, fences, crowd-control structures and associated electrical, water or drainage services.

Electrical equipment needs particular attention. Leads and equipment exposed to weather require suitable protection. Cables in public or vehicle areas should be routed, covered or mechanically protected against damage and trip risks. Dangerous equipment should be isolated and removed from use.

Animals should be restrained appropriately. Electrical wiring in animal areas should be positioned or mechanically protected against chewing, kicking and other foreseeable damage.

Useful documents may include:

  • a site induction and contractor coordination record
  • a task or contract-specific risk assessment
  • safe work procedures or a SWMS where applicable
  • a traffic or vehicle movement plan
  • temporary structure installation instructions and inspection records
  • electrical inspection, testing and isolation records
  • lift plans, plant checks and daily pre-starts
  • an emergency management and evacuation plan.

Documents should match the real layout, equipment and work sequence. They should also be reviewed when weather, access, structures, services or overlapping activities change.

When should a SWMS or another site-specific document be used?

For construction work, ask before mobilisation whether any task is classed as high risk construction work in the relevant jurisdiction and whether a SWMS is required. Check the current regulator description against the actual work rather than relying on the event name or a generic template.

Where a SWMS applies, it should deal with the specific task, work area, hazards, controls and coordination arrangements. Other work may be better covered by a site-specific risk assessment, safe work procedure, traffic plan, lift plan or installation method.

Practical warning signs

Stop and reassess if barriers have moved, public access is uncontrolled, vehicles and pedestrians share an unmanaged route, anchors or ropes are damaged, structures move in the wind, leads are exposed to water or traffic, or the documented method no longer matches the job.

Other warning signs include blocked emergency access, workers improvising without suitable equipment, poor communications, missing supervision and fatigue driving shortcuts. A workable emergency communication system should be tested, and the emergency plan should reflect the site's hazards, size and complexity.

How Blue Safe can help

Blue Safe provides compliant WHS documents tailored to the client's activities, applicable Australian WHS/OHS requirements, jurisdiction and industry. This includes suitable SWMS, risk assessments, safe work procedures, management plans, emergency documents and supporting records for temporary event work.

Blue Safe guarantees the document compliance of the WHS documents it provides, including eligible customer documents after Blue Safe has reviewed and upgraded them. Customers actively put the compliant documents into practice through controls, consultation, training, actions, records and evidence.

Official sources

Information current: 8 August 2026. Local requirements vary, so check current material from the regulator in the jurisdiction where the work occurs. A national Model Code provides general orientation and does not automatically apply as law in every jurisdiction.

Need Help with Compliance?

Get the templates mentioned in this guide to ensure you meet your obligations.

View SWMS TemplatesView Safe Operating ProceduresView WHS Forms

Still have questions?

Our team of WHS experts is here to help.