Working Under Raised Loads Safe Work Method Statement (SWMS)

$96.80

The Working Under Raised Loads Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Working Under Raised Loads Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Working Under Raised Loads Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Working Under Raised Loads Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Working Under Raised Loads Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Working Under Raised Loads Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Working Under Raised Loads Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • trips and falls
    • Incorrect manual handling
  • 2. Inspecting Equipment
    • Faulty equipment
    • Inadequate training
  • 3. Setting Up Load Area
    • Tripping hazards
    • Falling objects
  • 4. Lifting Load
    • Crushing injury
    • Musculoskeletal injury
  • 5. Positioning Under Load
    • Crushing injury
    • Falls from height
  • 6. Conducting Work Under Load
    • Falling objects
    • Crushing injury
  • 7. Removing Load
    • Injury from sudden release of load
    • Slips
    • trips
    • and falls
  • 8. Store Equipment
    • Mishandling of equipment
    • Trips due to incorrect storage
  • 9. Regular Maintenance
    • Injury due to lack of maintenance
    • Damage to equipment
  • 10. Training Staff
    • Inadequate training leading to accidents
  • 11. Emergency Procedures
    • Injury from panic in emergencies
    • Lack of knowledge about emergency responses
  • 12. Review Safety Operations
    • Outdated safety procedures
    • Ignorance of hazards
  • 13. Implementing Safety Suggestions
    • Resistance to change
    • Lack of communication
  • 14. Reporting Accidents/Incidents
    • Poor record keeping
    • Lack of accountability
  • 15. Debriefing After Work Completion
    • Information not disseminated
    • Complacency over completion
  • 16. Clean up
    • Slips
    • trips and falls
    • Incorrect manual handling
  • 17. Final Inspection
    • Miscommunication
    • Overlooking minor details
  • 18. Recording and Filing Reports
    • Data loss
    • Misinterpretation of information
  • 19. Conducting Regular Audits
    • Non-compliance
    • Inadequate record keeping
  • 20. Review of Procedures
    • Lack of follow-up
    • Ignorance of new risks

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Working Under Raised Loads Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart