Working Near Traffic Or Mobile Plant Safe Work Method Statement (SWMS)

$96.80

The Working Near Traffic Or Mobile Plant Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Working Near Traffic Or Mobile Plant Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Working Near Traffic Or Mobile Plant Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Working Near Traffic Or Mobile Plant Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Working Near Traffic Or Mobile Plant Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Working Near Traffic Or Mobile Plant Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Working Near Traffic Or Mobile Plant Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Unprepared work site
    • Inadequate worker training
  • 2. Traffic Control Set-up
    • Error in setting up control measures
    • Impatient drivers
  • 3. Plant Operation
    • Operator error
    • Mechanical failure of plant equipment
  • 4. Loading & Unloading of Materials
    • Dropping of materials
    • Crush or impact injuries from heavy loads
  • 5. Worker Placement
    • Inadequate provision for safety zones
    • Incorrect positioning of workers
  • 6. Maintenance of traffic control measures
    • Poor maintenance routines
    • Road conditions changing unexpectedly
  • 7. Communication between team
    • Miscommunication
    • Lack of clear signage
  • 8. Use of Mobile Plants
    • Collision risk
    • Operator error
  • 9. Night Work
    • Poor visibility conditions
    • Fatigue
  • 10. Emergency Procedure Awareness
    • Lack of knowledge on emergency procedures
    • Panic
  • 11. Manual Handling
    • Musculoskeletal Injuries
    • Slips and trips
  • 12. Dismantling of work station
    • Rushing
    • Incorrect dismantling process
  • 13. Packing up gear
    • Incorrect lifting techniques
    • Hitting objects
  • 14. Evaluation and report
    • Omission of crucial information
    • misreporting
  • 15. Post-operation cleanup
    • Exposure to dangerous substances
    • Inadequate disposal methods
  • 16. Vehicle movement around work area
    • Collision with workers
    • collision with stationary objects
  • 17. Pedestrian control
    • Pedestrians entering work area
    • interaction with machinery or vehicles
  • 18. Travel to and from site
    • Traffic accidents
    • Fatigue
  • 19. Handling of materials
    • Manual handling injuries
    • exposure to harmful substances
  • 20. Work in varying weather conditions
    • Dehydration
    • Heat stress or Hypothermia
    • Slips/falls due to wet conditions

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Working Near Traffic Or Mobile Plant Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart