Work Closely With Another Mechanic. Safe Work Method Statement (SWMS)

$96.80

The Work Closely With Another Mechanic. Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Work Closely With Another Mechanic. Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Work Closely With Another Mechanic. Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Work Closely With Another Mechanic. Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Work Closely With Another Mechanic. Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Work Closely With Another Mechanic. Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Work Closely With Another Mechanic. Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping over tools
    • Exposure to harmful fumes
  • 2. Equipment Setup
    • Electrocution
    • Falling objects
  • 3. Safety Gear Fitting
    • Incorrectly fitted safety equipment
    • Inefficient protection due to wear and tear
  • 4. Task Briefing
    • Miscommunication leading to accidents
    • Non-compliance to safety protocols
  • 5. Engine Inspection
    • Burns from hot components
    • Cuts from sharp components
  • 6. Fault Detection
    • Electric shocks
    • Ergonomic issues from working in an uncomfortable position
  • 7. Parts Replacement
    • Strains from heavy lifting
    • Crush injuries from improper handling of heavy parts
  • 8. Quality Control Check
    • Repeated motion injury
    • Eye strain
  • 9. Clean-Up
    • Tripping over left out tools
    • Cuts from improperly stored tools
  • 10. Debriefing
    • Miscommunication leading to accidents
    • Non-compliance to future tasks
  • 11. Maintenance Check
    • Injury due to faulty or poorly maintained equipment
    • Electric shocks
  • 12. Documentation
    • Paper cuts
    • Eye strain
  • 13. Tool Return
    • Injuries from loose tools
    • Tripping over improperly stored equipment
  • 14. Handover Process
    • Transmission of infections (if the equipment is shared)
    • Accidents due to miscommunication
  • 15. Shutdown Procedure
    • Electric shock
    • Burns from overheated machinery

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Work Closely With Another Mechanic. Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart