Welding, Cutting, Grinding Safe Work Method Statement (SWMS)

$96.80

The Welding, Cutting, Grinding Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Welding, Cutting, Grinding Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Welding, Cutting, Grinding Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Welding, Cutting, Grinding Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Welding, Cutting, Grinding Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Welding, Cutting, Grinding Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Welding, Cutting, Grinding Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect equipment setup
    • No proper PPE
  • 2. Welding Operation
    • Exposure to harmful fumes
    • Fire hazard
    • Electric shock
  • 3. Cutting
    • Debris in eyes
    • Cuts and laceration risks
  • 4. Grinding Operation
    • Noise exposure
    • Dust inhalation
  • 5. Material Handling
    • Ergonomic injuries
    • Falling objects
  • 6. Post-Operation Clean Up
    • Exposure to chemical residues
    • Slips and falls due to untidy area
  • 7. Machine Maintenance
    • Entrapment
    • Electrical hazards
  • 8. Site Setup
    • Trips and falls
    • Inadequate site lighting
  • 9. Equipment Check
    • Electrical faults
    • Improper tool usage
  • 10. Material Selection
    • Reactive materials
    • Unsuitable material for task
  • 11. Personal Safety Check
    • Failure to use proper PPE
    • Inadequate safety training
  • 12. Safe Operation Techniques
    • Ignoring standard operating procedures
    • Improper tool handling
  • 13. Ventilation Ensuring
    • Lack of adequate ventilation
    • Inhalation dangers from welding/cutting smoke
  • 14. Fire Safety Measures
    • Fire dangers from sparks and hot surfaces
    • Absence of fire extinguishing equipment
  • 15. Tool Storage
    • Unsafe storage practices
    • Cutting or crushing injuries from improperly stored tools
  • 16. Site Shut Down
    • Overlooked equipment shut down
    • Risks associated with inadequate site safety checks
  • 17. Emergency Procedures
    • Lack of emergency preparedness
    • Inadequate access/ egress routes in case of emergency
  • 18. Equipment Inspection
    • Failure to identify and report faulty equipment
    • Risks from using inadequately inspected equipment
  • 19. Post-Operative Health Check
    • Risks from long-term exposure to hazards
    • overlooked minor injuries leading to complications
  • 20. Debriefing
    • Overlooking safety concerns
    • incidents or near misses prior to next operation

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Welding, Cutting, Grinding Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart