BlueSafe

Waterproofing SWMS

This SWMS covers waterproofing work from planning and substrate preparation through to membrane application, sealing, testing and cleanup.

Activities covered include

  • Review the scope and coordinate the waterproofing work
  • Apply floor and wall membrane
  • Clean up and complete sign-off

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Waterproofing SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers waterproofing work from planning and substrate preparation through to membrane application, sealing, testing and cleanup. It supports planning and risk management for wet surfaces, dust, vapours, materials handling, roof work, torch-on work and water testing.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review the scope and coordinate the waterproofing work
  • Set up and manage the work area
  • Inspect the substrate and moisture conditions
  • Prepare substrates and penetrations
  • Install vapour barriers and substrate isolation barriers
  • Apply floor and wall membrane
  • Seal joins and penetrations
  • Apply elastomeric roof coating
  • Install torch-on membrane
  • Conduct flood and weather testing
  • Clean up and complete sign-off

Who is this for?

For contractors, workers, supervisors and businesses carrying out waterproofing work.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review scope and coordinate works
  • Incorrect membrane system
  • Interface failure between trades
  • Unplanned occupied-area exposure
  • Inadequate worker competency
Set up work area
  • Unauthorised entry
  • Slip on wet surfaces
  • Trip hazards
  • Falling tools and materials
  • Manual handling strains
Inspect substrate and moisture
  • Dust inhalation
  • Silica-containing dust
  • Mould exposure
  • Hidden asbestos-containing material
  • Slip from water ingress
Prepare substrate and penetrations
  • Cuts from scrapers
  • Dust and flying particles
  • Noise from preparation tools
  • Penetration leaks
  • Damage to services
Install vapour barriers
  • Membrane puncture
  • Adhesive vapours
  • Trips on loose sheets
  • Manual handling strains
  • Fire from flammable adhesive
Create substrate isolation barriers
  • Differential movement cracking
  • Chemical incompatibility
  • Loss of membrane adhesion
  • Cuts from metal trims
  • Seal failure at junctions
Apply floor and wall membrane
  • Chemical skin contact
  • Vapour inhalation
  • Slip on wet coating
  • Repetitive strain
  • Inadequate waterproofing coverage
Seal joins and penetrations
  • Sealant vapours
  • Skin sensitisation
  • Poor weather seal
  • Cuts from cartridges
  • Water ingress at wall junctions
Apply elastomeric roof coating
  • Fall from roof edge
  • Fall through fragile roof
  • Wind-blown materials
  • Heat and UV exposure
  • Chemical exposure
  • Dropped objects
Install torch-on membrane
  • Burns from flame
  • LPG leak or fire
  • Ignition of combustible materials
  • Heat damage to substrate
  • Fall from roof edge
  • Fume inhalation
Conduct flood and weather testing
  • Water damage to building
  • Slip on wet surfaces
  • Electrical shock from water ingress
  • Membrane failure
  • Unauthorised access to test area
Clean up and sign off
  • Chemical spills
  • Fire from waste
  • Manual handling strains
  • Slip and trip hazards
  • Damage to completed membrane

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model Code of Practice: Construction Work (November 2024) — guidance for construction SWMS, access, falls and work above ground.
  • Model Code of Practice: Managing the Risk of Falls at Workplaces — guidance for fall-prevention design, training, supervision, inspection and rescue arrangements.
  • Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace — guidance for consultation, the hierarchy of controls, SDS use, chemical storage and exposure controls.
  • Model Code of Practice: Preparation of Safety Data Sheets for Hazardous Chemicals — SDS guidance for safe handling, storage, disposal, first aid and emergency information.
  • Model Code of Practice: Managing the Risks of Plant in the Workplace (November 2024) — guidance for plant selection, inspection, safe operating limits and suspended loads.
  • Model Code of Practice: Work on Roofs – Commercial and Industrial Buildings — guidance for roof access, edges, voids, fragile surfaces, weather and hazardous chemicals; confirm adoption in the applicable jurisdiction.
  • AS 3740 Waterproofing of domestic wet areas.
  • AS 4654.1 Waterproofing membranes for external above-ground use — materials.
  • AS 4654.2 Waterproofing membranes for external above-ground use — design and installation.
  • AS/NZS 1891 series Industrial fall-arrest systems and devices.
  • AS/NZS 5532 Manufacturing requirements for single-point anchor device used for harness-based work at heights.
  • AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment.
  • AS/NZS 1716 Respiratory protective devices.
  • AS/NZS 1337.1 Personal eye-protection equipment.
  • AS/NZS 2210.3 Safety footwear.
  • AS/NZS 1270 Hearing protectors.
  • AS/NZS 1801 Occupational protective helmets.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionFlooring and TilingRoofing Contractors

Related templates

$79.50

One-time payment