This SWMS covers planning, site setup, tank installation, connections, testing and handover.
Activities covered include
- Review the design, work plan and installation location
- Unload, lift and place the tank
- Fill, test, clean up and complete handover records
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers planning, site setup, tank installation, connections, testing and handover. It supports managing risks throughout water tank installation activities.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Review the design, work plan and installation location
- Set up site boundaries, service controls and access arrangements
- Position plant and complete pre-use checks
- Prepare the base and footing
- Unload, lift and place the tank
- Secure the tank and install elevated fittings
- Connect plumbing, overflow, pump and electrical components
- Fill, test, clean up and complete handover records
Who is this for?
For contractors, workers, supervisors and businesses carrying out water tank installation work.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Review design and plan work |
|
| Establish site and service controls |
|
| Position plant and complete checks |
|
| Prepare base and footing |
|
| Unload and lift tank |
|
| Place and secure tank |
|
| Install elevated fittings |
|
| Connect plumbing and overflow |
|
| Install pump and electricals |
|
| Fill and test tank |
|
| Clean work area and demobilise |
|
| Complete records and handover |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to eliminate or minimise risks so far as is reasonably practicable, consult workers and other duty holders, provide information, training, instruction and supervision, and manage construction-work risks.
- Model Code of Practice: Construction work (November 2024), as adopted or approved in the relevant jurisdiction; use it as practical guidance for SWMS preparation, site-specific planning and high risk construction work controls.
- Model Code of Practice: Managing risks of plant in the workplace, as adopted or approved in the relevant jurisdiction; it applies to plant installation, commissioning, use and dismantling, and recognises plant crushing, electrical and access risks.
- Model Code of Practice: Moving plant on construction sites, as adopted or approved in the relevant jurisdiction; verify plant suitability, maintenance, operator competency, induction and SWMS arrangements.
- Model Code of Practice: Managing the risk of falls at workplaces, as adopted or approved in the relevant jurisdiction; provide trained workers, competent supervision and emergency/rescue arrangements for fall-control equipment.
- Model Code of Practice: Managing electrical risks in the workplace, as adopted or approved in the relevant jurisdiction; electrical installation work is to be undertaken by qualified persons and energised electrical work is prohibited except under strictly controlled exceptions.
- Model Code of Practice: Excavation work, as adopted or approved in the relevant jurisdiction; control underground-service, collapse and atmospheric risks, and do not operate combustion-engine plant in a confined excavation occupied by workers.
- Model Code of Practice: Hazardous manual tasks and Model Code of Practice: Managing noise and preventing hearing loss at work, as adopted or approved in the relevant jurisdiction.
- Technical guidance: AS 2550 series Cranes—Safe use; AS 1418 series Cranes, hoists and winches; AS 4991 Lifting devices; AS/NZS 1891 series Industrial fall-arrest systems; AS 1657 Fixed platforms, walkways, stairways and ladders; AS/NZS 1576 series Scaffolding; AS 3600 Concrete structures; AS/NZS 3500 Plumbing and drainage; AS/NZS 3000 Wiring Rules; AS/NZS 4020 Products for use in contact with drinking water; and the tank, anchor and pump manufacturers' current instructions. Australian Standards are technical guidance unless separately called up by applicable law, contract or approval conditions.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment