“`html
If you’re in the construction or trades industry, you’ll know how crucial it is to keep everyone safe and adhere to safety standards while on the job. Our Safe Work Method Statement (SWMS) Template specifically for the use of sealants or adhesives is designed with this goal in mind. Let’s dig into what makes this SWMS template a valuable tool for any workplace:
Key Features:
- Pre-filled and Comprehensive: Our template comes pre-loaded with vital information relevant to the use of sealants and adhesives. This means you spend less time figuring out where to start and more time keeping your team safe.
- Fully Editable and Customisable in Microsoft Word Format: We’ve made sure our SWMS template can be easily edited in Microsoft Word. Adjust it to suit your specific project needs, add new information, or tweak existing details with no fuss.
- Includes the Scope of the Project and the Project Details: No two projects are the same. Our template includes fields to detail the scope and specific details of your project, ensuring that everyone involved understands the tasks at hand.
- Includes Checklist of Any High Risk Machinery on Site: Knowing what machinery poses higher risks is half the battle won. Our checklist feature prompts you to identify these machines, so you can plan accordingly.
- Includes Space for Recording Any Staff Training: Ensure all team members have received the necessary training by recording this information directly in the template. It’s there to help you ensure everyone is up to date and aware of their responsibilities.
- Includes Before and After Risk Ratings: Assessing risk before and after implementing measures is critical. We’ve included a section to record these ratings, helping you track the effectiveness of your safety strategies.
- Includes Resources for Use of Legislative References: Because staying compliant with legislation is essential, we provide space to reference legislative guidelines pertinent to your work.
- Includes All PPE Required: From gloves to goggles, all personal protective equipment (PPE) required for using sealants or adhesives is detailed within, ensuring everyone knows what to wear to stay safe.
- Includes Risk Assessment and Risk Assessment Matrix: Our template covers a thorough risk assessment process, including a matrix to gauge the severity and likelihood of potential hazards.
- Includes a Checklist to Ensure All Requirements Have Been Covered When Implementing the SWMS: This checklist is your guiding tool to make sure no stone is left unturned in the implementation of the SWMS.
- Includes Sign Off Page for All Workers and Responsible Persons: Accountability and agreement are key. Our sign-off sheet is there for workers and responsible persons to confirm they’ve read and understood the SWMS.
- Easy to Use, Easy to Customise: You don’t need to be a tech whiz to navigate this document. Its user-friendly design ensures you can modify it as needed, efficiently.
- Suitable for Large Contracts and Tenders, Including Tier 1 Contractual Work: Whether you’re dealing with small tasks or large-scale tier 1 contracts, this template fits the bill, aligning with stringent safety requirements.
- Quick Delivery by Email: Need this SWMS template fast? Once purchased, we’ll zip it over to your email without delay, getting you equipped and ready to go.
This Safe Work Method Statement Template is here to assist you in maintaining a safe work environment when dealing with sealants or adhesives. By considering every angle, it aids in navigating safety requirements smoothly and effectively. Always remember, safety first!
“`
The Using Sealants Or Adhesives Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Exposure to chemicals
- slips and trips
- 2. PPE Selection
- Incorrect PPE use
- lack of PPE availability
- 3. Area Inspection
- Unidentified hazards
- inadequate lighting
- 4. Ventilation Setup
- Poor ventilation
- inhalation of fumes
- 5. Material Handling
- Manual handling injuries
- spills
- 6. Mix Adhesives
- Chemical exposure
- incorrect mixture ratios
- 7. Application Surface Prep
- Inadequate surface prep
- contamination
- 8. Sealant/Adhesive Application
- Contact with skin
- improper application techniques
- 9. Use of Tools
- Equipment malfunction
- inappropriate tool selection
- 10. Excess Removal
- Improper waste disposal
- residue causing slips
- 11. Curing Process
- Insufficient curing time
- exposure to uncured adhesive
- 12. Clean-up
- Chemical exposure during cleaning
- slip hazards from wet surfaces
- 13. Waste Disposal
- Environmental contamination
- incorrect disposal methods
- 14. Final Inspection
- Missed defects
- overlooked safety concerns
- 15. Reporting
- Inaccurate reporting of hazards
- delay in rectifying issues
- 16. Training and Review
- Lack of adequate training
- failure to refresh safety knowledge
- 17. Emergency Procedures
- Improper emergency response
- lack of communication in emergencies
- 18. Storage of Materials
- Improper storage conditions
- risk of fire or leakage
- 19. Transport of Materials
- Accidental spills
- manual handling during transport
- 20. Record Keeping
- Failure to maintain proper records
- data loss
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Using Sealants Or Adhesives Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


