Underground Borer Machine Operations. Risk Assessment

$79.50

The Underground Borer Machine Operations. Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Underground Borer Machine Operations. Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Underground Borer Machine Operations. Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping hazards
    • Electrical faults
  • 2. Pre-start Checks
    • Incorrect setup
    • Untrained personnel
  • 3. Operation Start
    • Mechanical failure
    • Noise pollution
  • 4. Boring Process
    • Accidental contact with live parts
    • Dust inhalation
  • 5. Material Handling
    • Falling objects
    • Manual lifting injuries
  • 6. Machine Maintenance
    • Electric shock
    • Working at height risks
  • 7. Emergency Procedures
    • Inadequate response to emergencies
    • Panic
  • 8. System Shutdown
    • Uncontrolled release of energy
    • Mechanical failures
  • 9. Clean-up
    • Exposure to chemicals
    • Cuts from sharp objects
  • 10. Inspection and Reporting
    • Incomplete inspections
    • Missed hazards
  • 11. Tools and Equipment Storage
    • Improper tools storage
    • Carrier accidents
  • 12. Waste Management
    • Toxic exposure
    • Contamination
  • 13. Safety Briefings
    • Poor communication
    • Lack of hazard awareness
  • 14. Eight-hour Shifts
    • Fatigue
    • Stress-related conditions
  • 15. Training and Competency Checking
    • Inadequate training
    • Misinformation
  • 16. Safety Checkpoints Review
    • Missed checkpoints
    • Non-compliance
  • 17. Quality Assurance
    • Defective products
    • Product returns
  • 18. Incident Reporting
    • Delayed reporting
    • Incomplete reports
  • 19. Regular Audits
    • Missed deadlines
    • Unresolved issues
  • 20. Documentation and Records
    • Poor recordkeeping
    • Data breaches
Shopping Cart